29 September 2013

What is KPI

Key Performance Indicators (KPI’s) are the critical success factors that define an organization’s progress. KPI’s are always measurable, and are trended over time to show progress and take action where needed. KPI’s can be defined at various levels in an organization, from the CEO to the sales team to the manufacturing floor. These are the statistics generated from the organizational metrics
The KPIs are to be simple, Measurable, repeatable, and which can be analysed. They are dynamic depeding upon the organization and must be in line with the organizational goals.
KPI must be including the fundamentals, which are basic and are needed for the sustenance of the organization. In addition to this, the KPIs must be looking at future growth of the organization.

Here are some examples of KPI

At CEO level, Earnings per share, Market share etc
For a BPO, Average on-hold time for customers calling
No of defects for a engineering process
Process yield for a manufacturing team

What is Design of Experiments (DOE)

Designed of Experiments (DOE) is a structured approach for varying process and/or product factors (x’s) and quantifying their effects on process outputs (y’s), so that those outputs can be controlled to optimal levels. 

DOE deals with identification of critical factors and their reponse variables, and the magnitude of the response for each level of each of the critical factors. DoE is also used to understand the interaction between the various critical factors to ensure right mix of the critical factors to obtain the optimum amount of response.
DoE is used to understand the transfer function and mathematical model for the optimization of the response variable.
DC motor manufacturer might wish to understand the effects of two process variables, wire tension and trickle resin volume, on motor life. In this case, a simple two factor (wire tension and trickle resin volume), two level (low and high values established for each of the two factors) experiment would be a good starting point. Randomizing the order of trials in an experiment can help prevent false conclusions when other significant variables, not known to the experimenter, affect the results. There are a number of statistical tools available for planning and analyzing designed experiments.

What is a Spaghetti plot

Spaghetti plots are a method of viewing data to visualize possible flows through systems. Flows depicted in this manner appear like noodles, hence the coining of this term. This method of statistics was first used to track routing through factories. Visualizing flow in this manner can reduce inefficiency within the flow of a system. In regards to animal populations and weather buoys drifting through the ocean, they are drawn to study distribution and migration patterns. Within meteorology, these diagrams can help determine confidence in a specific weather forecast, as well as positions and intensities of high and low pressure systems. They are composed of deterministic forecasts from atmospheric models or their various ensemble members. Within medicine, they can illustrate the effects of drugs on patients during drug trials.

Single-Minute Exchange of Die (SMED)

Single-Minute Exchange of Die (SMED) is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product. This rapid changeover is key to reducing production lot sizes and thereby improving flow (Mura). The phrase "single minute" does not mean that all changeovers and startups should take only one minute, but that they should take less than 10 minutes (in other words, "single-digit minute"). Closely associated is a yet more difficult concept, One-Touch Exchange of Die, (OTED), which says changeovers can and should take less than 100 seconds. A Die is a tool used in manufacturing. However SMED's utility of is not limited to manufacturing

The concept arose in the late 1950s and early 1960s, when Shigeo Shingo was consulting to a variety of companies including Toyota, and was contemplating their inability to eliminate bottlenecks at car body-moulding presses. The bottlenecks were caused by long tool changeover times which drove up production lot sizes. The economic lot size is calculated from the ratio of actual production time and the 'change-over' time; which is the time taken to stop production of a product and start production of the same, or another, product. If change-over takes a long time then the lost production due to change-overs drives up the cost of the actual production itself. This can be seen from the table below where the change-over and processing time per unit are held constant whilst the lot size is changed. The Operation time is the unit processing time with the overhead of the change-over included. The Ratio is the percentage increase in effective operating time caused by the change-over. SMED is the key to manufacturing flexibility.

The Seven Wastes of Services

The original seven wastes (Muda (Japanese term)) were defined by Taiichi Ohno, the father of the Toyota Production System. These wastes have been often redefined to better fit new organisations, industries, or external pressures.

One redefinition of these wastes for service operations by Bicheno and Holweg (2009) is as follows:

1. Delay on the part of customers waiting for service, for delivery, in queues, for response, not arriving as promised. The customer’s time may seem free to the provider, but when she takes custom elsewhere the pain begins.
2. Duplication. Having to re-enter data, repeat details on forms, copy information across, answer queries from several sources within the same organisation.
3. Unnecessary Movement. Queuing several times, lack of one-stop, poor ergonomics in the service encounter.
4. Unclear communication, and the wastes of seeking clarification, confusion over product or service use, wasting time finding a location that may result in misuse or duplication.
5. Incorrect inventory. Being out-of-stock, unable to get exactly what was required, substitute products or services.
6. An opportunity lost to retain or win customers, a failure to establish rapport, ignoring customers, unfriendliness, and rudeness.
7. Errors in the service transaction, product defects in the product-service bundle, lost or damaged goods.

17 September 2013

What is a Project Charter in a Six Sigma Project - What are the main elements of the Charter

A Project Charter is essentially a planning doument for the six sigma project. The document also serves as an acceptance document for the project. This is the essential record through which the management accepts and supports the project. This document is essentially an agreement between the Management and the project team on what is expected from both the sides. This is used to 
  • Keep the project team aligned with the organizational Goals.
  • Clarifies what is expected out of the team
  • Keeps the team focussed on the objective
  • the project teams role is in fact increased from the champion after the charter is agreed.

A charter is prepared, once you have defined the problem, to communicate and confirm agreement between the problem-solving team and management. A simple template is presented here. http://www.docstoc.com/docs/147469086/Six-Sigma-Project-Charter-Template?

There can be many other forms to use for a project charter. The most important information needed for management to approve the project must be captured here.

Here are the essential elements of the Project Charter
  • Project Name
  • Project Goal
  • Problem Statement
  • Business Case
  • Milestones
  • Support Needed
  • Estimated Cost
  • Signatures/Approvals.
These will define the complete description of the project in the language fo Management.

26 August 2013

CMMI Service - What are the Process Areas by Maturity Levels

There are a total of 24 process areas to defined in the CMMI - Service Model. This model is also called as CMMI-SVC. These are divided into 4 groups by Maturity Level. Even though there are 5 Maturity levels, there is none defined for Level 1. The maturity levels Start only from Level 2. For an organization to achieve a specific maturity level, it must be practicing all the practices defined for each of the process area defined for the specific Level.  Level 4 & 5 are called as High Maturity Process Areas. I will discuss each of the process areas in my later posts. As the Maturity Level increases, the practices required to be implemented increases. Please note that a higher level includes all the process areas listed in the Previous level.

Now Let Us list the process areas, along with their common acronym Used.

Level 1 - Initial
None 
Level -2 - Managed

  1. Configuration Management (CM) 
  2. Measurement and Analysis (MA)
  3. Process and Product Quality Assurance (PPQA)
  4. Requirements Management (REQM)
  5. Supplier Agreement Management (SAM) - This PA is optional
  6. Service Delivery (SD)
  7. Work Monitoring and Control (WMC)
  8. Work Planning (WP)
Level -3 -Defined

  1. Capacity and Availability Management (CAM)
  2. Decision Analysis and Resolution (DAR)
  3. Incident Resolution and Prevention (IRP)
  4. Integrated Work Management (IWM)
  5. Organizational Process Definition (OPD)
  6. Organizational Process Focus (OPF
  7. Organizational Training (OT)
  8. Risk Management (RSKM)
  9. Service Continuity (SCON)
  10. Service System Development (SSD)
  11. Service System Transition (SST)
  12. Strategic Service Management (STSM)
Level - 4- Quantitatively Managed
  1. Organizational Process Performance (OPP)
  2. Quantitative Work Management (QWM)
Level - 5 Optimizing
  1. Causal Analysis and Resolution (CAR)
  2. Organizational Performance Management (OPM)
We will discuss various components subsequently

24 August 2013

Capability and Maturity Model (CMMI) - Levels of CMMI

According to Software Engineering Institute, there are 5 levels of Capability and Maturity.
They are
1. Initial - Process Ineffective, Poorly controlled and Highly Reactive.
2. Managed - Process Characterized for Projects and often Reactive
3. Defined - Process Characterized for organization and is proactive. (Projects tailor the organizational process to the project needs)
4. Quantitatively Managed - Process Measured and Controlled.
5. Optimizing - Focus on Process Improvement.
From Maturity Level 2 and above, there are a set of process Areas which the organization is expected to implement. we will discuss these in the subsequent posts.

11 August 2013

Key Components of a Project Charter II

image  In the previous sections I have covered the list of key components and the problem statement in the following articles. I will continue this discussion on the Charter so that the problem is well understood at all levels and support wherever needed in clearly identified. A good start is half done. Same way in a Six sigma Project, A good charter becomes heart of the project and to achieve the goals.
http://www.excellencementor.net/2013/09/what-is-project-charter-in-six-sigma.html
http://www.excellencementor.net/2013/10/key-components-of-project-charter-i.html
Once you have defined the problem clearly the other sections of the charter need to be completed.  Follow these sections in the order so that the logical flow is available. However, this is not mandatory. The details are below.
Project Goal or Goal Statement: The Goal statement is linked to resolution of the problem. Important consideration here is to set a goal which is achievable in a period of about 120 to160 days. The goal is agreed by the team and team champion as achievable. This really helps in setting the scope of the project.
Business Case & Estimated cost: This section is for the Management to understand the Return on Investment. This shall be as realistic as possible since this is commitment to the Management on the benefits of the project. The business case shall be linked to resolving the problem and the benefit shall be in line with reducing the losses as outlined in the problem statement and achieving the goal in the goal statement.
Support Needed: This will help the management to understand allocation of resources and support. This shall outline the likely support needed from outside the project team.
Milestones: Clearly define the timelines for each of the phase of the project. This will help to see if the project is in the right direction and correct course by both management and the project team.
Signatures/Approvals : This is just a commitment for the project both from management and the project team.

17 March 2013

What is Six Sigma- An Introduction to many faces of Six Sigma

Six Sigma is a Quality management program developed in Motorola in the 1980s; Adopted with a zeal by GE in mid 90s; Being used effectively all over the world now. The goal of six sigma is to achieve continual improvement. The term Six Sigma is used in many contexts with an aim of Continual Improvement. Some of them are listed below.
Six Sigma is used as a Management Philosophy focused on business process improvements to:

  • Eliminate waste, rework, and mistakes
  • Increase customer satisfaction
  • Increase profitability and competitiveness
  • Statistical measure to objectively evaluate processes.
Six Sigma is used as a business strategy by concentration on Quality and defect reduction resulting in increase profitability and competitiveness. Fewer defects will lead to increased reliability and brand popularity.
Six Sigma is used as a metric to define the Quality of the output and capability of production process to produce defect free output.  
Six Sigma Is a Method for Continual Improvement. This is the most popular use of this word. A six sigma project has a defined method of an improvement project. These are DMAIC and DFSS.
Six Sigma is a Benchmark or a Goal to achieve the highest standard of productivity. A Six Sigma Quality is equivalent to less than 3.4 defects per million opportunities. This is the Vision for most of the organizations to ensure they deliver high quality to the customers.
Six Sigma is a Statistical Measurement to define the process Capability based on Standard deviation. For any normal distribution, the process capability is equal to six Standard Deviations.
Six Sigma is used in many other contexts which are most relevant and ensure customer satisfaction.
An organization can easily tell the customer about its quality by using the term six sigma.

10 March 2013

How to Prioritize the Ideas Generated – Usage of Project Prioritization Matrix.

Previously we have discussed various ideas which can be considered for a Continual Improvement Project. Once all the ideas are identified, you need to prioritize these ideas. A total value for each project is calculated and plotted against an ease of completion number to determine which projects have the most value for the effort expended. Why Prioritization
  • Prioritization will keep your focus on the high impact improvements. it is always advisable to keep the focus while attempting the improvements. Additional benefits include greater visibility and acceptance from the stakeholders. A carefully selected project can be a game changer with respect to the perception on the Continual Improvement in any organization.
  • Prioritization helps you to rank potential projects by both their weighted benefits and their relative ease of completion.
  • It also helps in reorder the ranking of projects if the weighting of the company’s strategic goals changes (for example, the last Quarter there will be very high focus on the Revenue and targets.)
How to prioritize ideas
  • You can download the project selection matrix from the location below. http://www.docstoc.com/docs/148227866/Continual-Improvement-project-selection-criteria
  • Identify a list of project selection criteria (For example Revenue, Cost, inventory customer satisfaction, etc)
  • Develop a list of potential projects and enter in the left column of the table
  • Assign weightage to each of the criteria on top of the list. A weightage can be given based on the impact like 0- No Impact, 1- Low Impact, 3- Medium Impact and 5 – High Impact).
  • Using a team, develop a score for each of the criteria.
  • You will get the Priority Number based on Multiplication of these two.
  • You can order them according to the priority Number
  • After a project prioritization matrix is created, you can easily update it by adding new potential projects and changing the weighting of the project values to reflect changes in organizational priorities.
This work is licensed under a Creative Commons license.

27 February 2013

Ideas for Six Sigma Projects - By Function and Industry

We have discussed the General Ideas and Ideas from Issues earlier. Here is another trigger for you to look by function. If you are new in the continual Improvement Journey, these various classifications help you project identification and selection. Classifying bu function will help you to ignite those who have less time to look at general issues.
Few years back it was generally believed that the six sigma methodology is used for Manufacturing Industry is only. How ever, Many service and IT organizations have adopted this and saved tons of money. Even this methodology can be used to increase the process velocity and lean out the process. You may take up the improvements in a step by step approach which can give you better clarity and improve the whole system.

Project Selection Ideas By Function

Six Sigma Project Ideas for Finance/Accounting function
Reduce the time taken to close the accounting books (cycle time)
Improve the forecast accuracy
Spending control
Reduce balance sheet risk
Eliminate unstable customers and associated risks
Improve processing of payment to vendors/suppliers
Improve Days Sales Outstanding (DSO) — the average time taken by a company to collect payment from its customers
Reduce payroll process cycle time
Improve cash management processes
Improve payment/collection processes
Reduce electronic financial transaction costs
Reduce the cycle time of reconciliation
Reduce the procure to pay cycle
Standardize the accrual and deferral processes
Cycle time reduction in processing of Invoice generation
Reduction of cycle time in Purchase order generation

Six Sigma Project Ideas for Human Resources function
Reduce the turn around time to hire an employee
Reduce the time to process an insurance claim
Improve employee on-boarding and orientation processes
Reduce expenditures for recruiting firms
Improve hit-rate for successful hiring
Reduce Attrition
Improve timeliness and the value of employee performance reviews
Reduce absenteeism
Improve training efficiency
Improve employee satisfaction
Identify and correct retention issues

Six Sigma Project Ideas for Sales function
Improve cross-sell opportunities
Reduce time required to enter sales orders
Reduce errors and rework associated with sales orders
Reduce customer credit worthiness cycle time
Reduce the number of "bad deals" that are processed
Improve the cycle time of the entire sales order to cash process
Increase repeat orders/customers

Six Sigma Project Ideas for Shipping/Receiving function
Improve on-time delivery of products to customers
Improve on-time delivery of goods to our facility from vendors
Improve documentation accuracy
Reduce line downtime due to shipping/receiving
Improve inventory control/rotation
Improve inspection processes
Reduce the space occupied by the inventory

Now for some of the ideas by Industry. This section can be used by linking the ideas to specific industry

Sis sigma Project Ideas for Information Technology Industry
Reduce network/server/application downtime
Improve process of logging-in to network from remote locations
Improve system reliability/uptime
Standardize computer loads for configuration and support productivity improvement

Six Sigma Project Ideas for Product/Service Design industry
Reduce time required to design a product or service
Reduce errors in design
Reduce production time
Reduce testing time
Optimize Inventory

Six Sigma Project Ideas for Call Center Industry
Increase/decrease (depending on your business needs) average talk time
Reduce abandon calls
Improve employee knowledge
Reduce number of times customer is put on hold
Reduce Call drops
Improve resolution of queries
You may start resolving problems and  one at a time. do not attempt a great improvement at once. In case you have to then pilot the solution and deploy horizontally.

 