23 February 2014

Risk Management- II - Risk Occurrence and Response

Risk Management
The Picture above depicts typical response needed for the occurrence of Risk at various project stages and impact on the Project Goal. Before getting in to the response needed, few definitions here.

Risk - An undesirable situation or circumstance that has both a likelihood of occurring and a potentially negative consequence. This is typically a likely future event based on various project variables and not yet occurred. The impact is not being experienced yet.
Risk Mitigation - Risk Mitigation plan include the techniques followed to avoid, reduce and control the probability of occurrence of the likely future event called risk. These may include changes to the requirements, actions to reduce the occurrence such as assignment of additional responsibilities etc.
Contingency Plan - A contingency plan is essentially the planned actions in the event of failure of mitigation. All efforts are put on the reduce the probability of occurrence, but the despite best efforts, the risk may occur. The contingency plan depicts, the course of action when the risk occurs. This is essentially the plan B.
Issue Management - Issue is an event or condition that has already occurred and has negligible or little impact on the objectives. The impact is negligible as there is a work around possible and the project goal can still be achieved. The issue management will depict the actions to be taken in these condition to bring normalcy to the program.

08 December 2013

Introduction to Configuration Management

Configuration Management and standards

Configuration Management gives the identifiability and traceability of a product at various stages of the product life. The requirements specific to configuration management are specified in various standards and Models with minor variations.

  • A Level 2 Process Area for CMMI - Configuration Management (CM)
  • Clause 7.2 of AS 9100 Rev C- Configuration Management
  • Clause 7.5.3 of ISO 9001:2008 - Identification and Traceability
  • A specific standard to deal with Configuration Management - ISO 10007

Configuration Management Process

Configuration Management process is broadly described in ISO 10007 which calls for the following steps of configuration management. These steps will help the organization to ensure the product released is of right configuration and in case of any errors, the exact point of error is traced. Also, this will help to improve the product, based on various stages.

Configuration Management Planning

A documented configuration management plan outlining the configuration management procedures being used, and describe the roles and responsibilities to manage the configuration. This plan shall be documented, controlled and approved. Wherever possible, the plan must refer to the organizational procedures.

Configuration Identification

A list of configurable items shall be selected based on various factors such as statutory and regulatory requirements, product design stages, criticality in terms of risks etc. These ites are to be selected based on their management of physical and functional characteristics being managed.

Change control

The changes to the configuration items must be controlled and documented. The process and records for changes shall include justification for change, evaluation of consequences of changes, and approval of changes. This changes shall always be base lined at periodic changes to the physical and functional characteristics of the product. 

Configuration status accounting


The configuration status accounting activities throughout the life cycle of the product in order to support and enable an efficient configuration management process. Ideally, at any point of time, the product configuration is the last baseline and the changes done after the baseline.

Configuration audit

Periodic audits are to be conducted on the configuration based on the docmented procedures, to ensure the product meets the configuration requirements are not. Genreally two types of configuration audits are conducted. 
Physical configuration Audit :  To ensure that the product is meeting the physical charecteristics as specified in the product configuration information
Functional configuration audit : To ensure that the prodcut has achieved the functional performance as defined in the product configuration information

27 October 2013

Risk Management II - What are the benefits of a Risk Management Program

The previous article on Risk Management is Risk Management I - A proactive approach to resolve future root causes and their potential consequences.
Purpose of a Risk Management Plan
Risk management program defines the preparedness of an organization to deal with potential occurrences.  It defines the approch and attitude towards risks. The risk mangement program defines, what are those risks the organization is ready to accept,and the plan to deal with those un aceptable risks,and also defines the main requirements of risk management plan.
The risk Management program helps the organization in the following ways:
  • To identify risks and prapare an action plan to deal with the risk
  • To reduce occurances and impacts of risk
  • To understand significance/severity of risks
  • To promote organizational behaviors forcused on risk management
  • To increase effectiveness of product and service delivery to customer
  • Create a process for who, what, when, where, how and how much.
  • Maintain information on historic issues.
  • Capitalize on historic issues to prevent future issues.
  • Bring out hidden risk knowledge, so it can be managed.
Benifits of Risk Management Program
  • Encourage proactive management
  • Be aware of the need to identify and treat risk throughout the organization
  • Improve the identification of threats
  • Comply with relevant legal and regulatory requirements and international norms
  • Improve financial reporting and governance
  • Improve stakeholder confidence and trust
  • Establish a reliable basis for decision making and planning
  • Improve organizational controls
  • Effectively allocate and use resources for risk treatment / handling
  • Improve operational effectiveness and efficiency;
  • Cost of risk management is typically less than the cost of issue management
  • Enhance health and safety performance, as well as environmental protection
  • Minimize losses and improve loss prevention and incident management
  • Improve organizational learning and resilience
  • Increase the likelihood of achieving objectives
The most importent benifit of the risk management program is that it gives the organization a future visibility. It deals with futur events and not manage the current issues. The organization will be ready to face the realization of the risk. This gives a state of readiness against the potentila consequences

13 October 2013

Risk Management I - A proactive approach to resolve future root causes and their potential consequences.

Risk Management gives the visibility on the future root causes, their consequences and ways and means to reduce the impact of the potential negative effects of these future root causes.  The underlined words "Future" and "potential" here indicate, risk management is a futuristic strategy of the organization. Risk Management can be applied at all levels of the organization. It can be applied at project, level, unit level or at organization level.
Risk Management is not a mandatory process required for ISO 9001. However, this is a Mandatory process as per AS 9100 and also, a Maturity level 2 (ML2) process area for CMMI. Even though the requirements of both AS 9100 and CMMI are similar, there are subtle differences between these two.

To discuss more on the Risk Management (RSKM) we will start with few definitions.

What is Risk?
Risk is defined as an undesirable situation or circumstance that has both a likelihood of occurring and a potentially negative consequence.
This is possible at every stage of Production or Service Provision, right from the contract development stage till Post Sales. The potential negative consequence chiefly rely on the Quality, Schedule or Cost. Whatever effort you put in, the process at every stage has some possible slippages (Remember Murphy). The Organization shall therefore look at identifying and mitigating the effects of these likely slippages, at all Levels.

What is risk management?. Why is the risk management needed?
Risk Management is an iterative process to identify, assess, reduce, accept, and control risks in a systematic, proactive, comprehensive and cost effective manner, taking into account the business, costs, technical, quality and schedule programmatic constraints.
Risk Management is needed to reduce the chances of potential negative consequence of a likely event on the business. This involves a focus on the risks to meeting customer requirements, and preventing product non conformance escapes.   The absence of a Risk Management program can result in known, unknown, and unknowable /unforeseen problems for the Customer and Stakeholders concerning the cost, schedule, and technical performance of programs and concerning the quality and on-delivery performance of products and services.

In the Second Part, we will discuss the benifits of a Risk Mangement program.

26 August 2013

CMMI Service - What are the Process Areas by Maturity Levels

There are a total of 24 process areas to defined in the CMMI - Service Model. This model is also called as CMMI-SVC. These are divided into 4 groups by Maturity Level. Even though there are 5 Maturity levels, there is none defined for Level 1. The maturity levels Start only from Level 2. For an organization to achieve a specific maturity level, it must be practicing all the practices defined for each of the process area defined for the specific Level.  Level 4 & 5 are called as High Maturity Process Areas. I will discuss each of the process areas in my later posts. As the Maturity Level increases, the practices required to be implemented increases. Please note that a higher level includes all the process areas listed in the Previous level.

Now Let Us list the process areas, along with their common acronym Used.

Level 1 - Initial
None 
Level -2 - Managed

  1. Configuration Management (CM) 
  2. Measurement and Analysis (MA)
  3. Process and Product Quality Assurance (PPQA)
  4. Requirements Management (REQM)
  5. Supplier Agreement Management (SAM) - This PA is optional
  6. Service Delivery (SD)
  7. Work Monitoring and Control (WMC)
  8. Work Planning (WP)
Level -3 -Defined

  1. Capacity and Availability Management (CAM)
  2. Decision Analysis and Resolution (DAR)
  3. Incident Resolution and Prevention (IRP)
  4. Integrated Work Management (IWM)
  5. Organizational Process Definition (OPD)
  6. Organizational Process Focus (OPF
  7. Organizational Training (OT)
  8. Risk Management (RSKM)
  9. Service Continuity (SCON)
  10. Service System Development (SSD)
  11. Service System Transition (SST)
  12. Strategic Service Management (STSM)
Level - 4- Quantitatively Managed
  1. Organizational Process Performance (OPP)
  2. Quantitative Work Management (QWM)
Level - 5 Optimizing
  1. Causal Analysis and Resolution (CAR)
  2. Organizational Performance Management (OPM)
We will discuss various components subsequently

24 August 2013

Capability and Maturity Model (CMMI) - Levels of CMMI

According to Software Engineering Institute, there are 5 levels of Capability and Maturity.
They are
1. Initial - Process Ineffective, Poorly controlled and Highly Reactive.
2. Managed - Process Characterized for Projects and often Reactive
3. Defined - Process Characterized for organization and is proactive. (Projects tailor the organizational process to the project needs)
4. Quantitatively Managed - Process Measured and Controlled.
5. Optimizing - Focus on Process Improvement.