Showing posts with label Value Analysis. Show all posts
Showing posts with label Value Analysis. Show all posts

26 August 2012

What is Value Stream Mapping?

VSM is a Lean tool, to visualize the various steps and their contribution to the overall process.
Value
When a product or service has been perceived or appraised to fulfill a need or desire--as defined by the customer--the product or service may be said to have value or worth. Components of value may include quality, utility, functionality, capacity, aesthetics, timeliness or availability, price, etc.
Value Stream

All the activities (both value-added and non-value added) required within an organization to deliver a specific service; “everything that goes into” creating and delivering the “value” to the end-customer.
Process Map
A visual representation of the sequential flow of a process. Used as a tool in problem solving, this technique makes opportunities for improvement apparent Value Stream MappingA graphical representation of all tasks and activities needed to transform input materials and information into an output.  Value Stream Analysis
The identification of all the specific activities occurring along the value stream, represented pictorially in a value stream map; see waste, unevenness, and overburden, size the opportunity, share a vision, communicate visually, permission to change, predict results
Non Value Added (NVA)

Those process steps in a Value Stream that take time, resources or space, but do not transform or shape the product or service to meet the needs of the customer 

What is Rapid Improvement Event (RIE)

Rapid Improvement Event (RIE)
A 4-5 day process utilizing a team based methodology to apply the lean tools for seeing waste and making immediate improvement and problem solving by working on the set up time or the Changeover time.
Set-up Time
Work required to change over a machine or process from one item or operation to the next item or operation; can be divided into two types:
1. Internal: set-up work that can be done only when the machine is not actively engaged in production OR
2. External: set-up work that can be done concurrently with the machine or process performing production duties
Changeover Time
As used in manufacturing, the time from when the last “good” piece comes off of a machine until the first “good” piece of the next product is made on that machine. Includes warm up, first piece inspection and adjustments. 

 
#InfoLinks #End of Infolinks