29 September 2013

What is KPI

Key Performance Indicators (KPI’s) are the critical success factors that define an organization’s progress. KPI’s are always measurable, and are trended over time to show progress and take action where needed. KPI’s can be defined at various levels in an organization, from the CEO to the sales team to the manufacturing floor. These are the statistics generated from the organizational metrics
The KPIs are to be simple, Measurable, repeatable, and which can be analysed. They are dynamic depeding upon the organization and must be in line with the organizational goals.
KPI must be including the fundamentals, which are basic and are needed for the sustenance of the organization. In addition to this, the KPIs must be looking at future growth of the organization.

Here are some examples of KPI

At CEO level, Earnings per share, Market share etc
For a BPO, Average on-hold time for customers calling
No of defects for a engineering process
Process yield for a manufacturing team

What is Design of Experiments (DOE)

Designed of Experiments (DOE) is a structured approach for varying process and/or product factors (x’s) and quantifying their effects on process outputs (y’s), so that those outputs can be controlled to optimal levels. 

DOE deals with identification of critical factors and their reponse variables, and the magnitude of the response for each level of each of the critical factors. DoE is also used to understand the interaction between the various critical factors to ensure right mix of the critical factors to obtain the optimum amount of response.
DoE is used to understand the transfer function and mathematical model for the optimization of the response variable.
DC motor manufacturer might wish to understand the effects of two process variables, wire tension and trickle resin volume, on motor life. In this case, a simple two factor (wire tension and trickle resin volume), two level (low and high values established for each of the two factors) experiment would be a good starting point. Randomizing the order of trials in an experiment can help prevent false conclusions when other significant variables, not known to the experimenter, affect the results. There are a number of statistical tools available for planning and analyzing designed experiments.

What is a Spaghetti plot

Spaghetti plots are a method of viewing data to visualize possible flows through systems. Flows depicted in this manner appear like noodles, hence the coining of this term. This method of statistics was first used to track routing through factories. Visualizing flow in this manner can reduce inefficiency within the flow of a system. In regards to animal populations and weather buoys drifting through the ocean, they are drawn to study distribution and migration patterns. Within meteorology, these diagrams can help determine confidence in a specific weather forecast, as well as positions and intensities of high and low pressure systems. They are composed of deterministic forecasts from atmospheric models or their various ensemble members. Within medicine, they can illustrate the effects of drugs on patients during drug trials.

Single-Minute Exchange of Die (SMED)

Single-Minute Exchange of Die (SMED) is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product. This rapid changeover is key to reducing production lot sizes and thereby improving flow (Mura). The phrase "single minute" does not mean that all changeovers and startups should take only one minute, but that they should take less than 10 minutes (in other words, "single-digit minute"). Closely associated is a yet more difficult concept, One-Touch Exchange of Die, (OTED), which says changeovers can and should take less than 100 seconds. A Die is a tool used in manufacturing. However SMED's utility of is not limited to manufacturing

The concept arose in the late 1950s and early 1960s, when Shigeo Shingo was consulting to a variety of companies including Toyota, and was contemplating their inability to eliminate bottlenecks at car body-moulding presses. The bottlenecks were caused by long tool changeover times which drove up production lot sizes. The economic lot size is calculated from the ratio of actual production time and the 'change-over' time; which is the time taken to stop production of a product and start production of the same, or another, product. If change-over takes a long time then the lost production due to change-overs drives up the cost of the actual production itself. This can be seen from the table below where the change-over and processing time per unit are held constant whilst the lot size is changed. The Operation time is the unit processing time with the overhead of the change-over included. The Ratio is the percentage increase in effective operating time caused by the change-over. SMED is the key to manufacturing flexibility.

The Seven Wastes of Services

The original seven wastes (Muda (Japanese term)) were defined by Taiichi Ohno, the father of the Toyota Production System. These wastes have been often redefined to better fit new organisations, industries, or external pressures.

One redefinition of these wastes for service operations by Bicheno and Holweg (2009) is as follows:

1. Delay on the part of customers waiting for service, for delivery, in queues, for response, not arriving as promised. The customer’s time may seem free to the provider, but when she takes custom elsewhere the pain begins.
2. Duplication. Having to re-enter data, repeat details on forms, copy information across, answer queries from several sources within the same organisation.
3. Unnecessary Movement. Queuing several times, lack of one-stop, poor ergonomics in the service encounter.
4. Unclear communication, and the wastes of seeking clarification, confusion over product or service use, wasting time finding a location that may result in misuse or duplication.
5. Incorrect inventory. Being out-of-stock, unable to get exactly what was required, substitute products or services.
6. An opportunity lost to retain or win customers, a failure to establish rapport, ignoring customers, unfriendliness, and rudeness.
7. Errors in the service transaction, product defects in the product-service bundle, lost or damaged goods.

17 September 2013

What is a Project Charter in a Six Sigma Project - What are the main elements of the Charter

A Project Charter is essentially a planning doument for the six sigma project. The document also serves as an acceptance document for the project. This is the essential record through which the management accepts and supports the project. This document is essentially an agreement between the Management and the project team on what is expected from both the sides. This is used to 
  • Keep the project team aligned with the organizational Goals.
  • Clarifies what is expected out of the team
  • Keeps the team focussed on the objective
  • the project teams role is in fact increased from the champion after the charter is agreed.

A charter is prepared, once you have defined the problem, to communicate and confirm agreement between the problem-solving team and management. A simple template is presented here. http://www.docstoc.com/docs/147469086/Six-Sigma-Project-Charter-Template?

There can be many other forms to use for a project charter. The most important information needed for management to approve the project must be captured here.

Here are the essential elements of the Project Charter
  • Project Name
  • Project Goal
  • Problem Statement
  • Business Case
  • Milestones
  • Support Needed
  • Estimated Cost
  • Signatures/Approvals.
These will define the complete description of the project in the language fo Management.

 