05 October 2015

How to set the improvement goal for Six Sigma Project

This is a general question asked especially when Six Sigma approach is used for Improvement. In cases where the project is taken up for Problem Solving, the goal setting is straight forward. In this case the goal is to solve the problem. (or Meet the Requirements)

However, it is very tough in case of Improvement Projects. Various methods are available for setting the goal. However, there is some pre work to be done in this case.

1. Collect all the metrics which are generated from the process you want to improve, (Example - Delivery rate, Quality, Defects, Customer Satisfaction, Effort ......)
2. Prioritize and identify the Primary Metric. Primary could be anything where you can improve upon. (Start with what is important to customer)
3. Baseline the Primary Metric and its relation with the secondary metrics. (This is needed to know what will happen when your primary metric moves and optimize the goal setting.)

Now the billion dollar question " How much we should set the target" "How much we can Improve" " How much improvement we Need". 
There are no standard set of rules for setting improvement goals. However, below are few guidelines.


  1. As a minimum, the goal shall be set in such a way that the difference between the current performance and the goal is statistically significant.
  2. The goal must be in line with the business expectations and the improvement shall be a breakthrough one instead of incremental one. a 5% improvement is incremental but 50% improvement is Breakthrough
  3. The goal shall take you towards the benchmark for the same process performance. Ideally the benchmark need to be considered is the industry best practice.
  4. The goal need to cover the gap between the entitlement and the current performance by atleast 70%. Entitlement is the performance which is expected for the investments already made or the best capability of the process internally. 

26 May 2014

Getting the Ideas from the team and building a solution - Nominal Group Technique (NGT)

The nominal group technique is used to generate ideas from team in Problem identification, solution generation and decision making. It can be used for teams of any size but ideally limited between 5 to 9 members. This number is ideal to get diversity and easy to find consensus among the team. This technique is particular useful when few of the team members are more vocal than others. Generally a facilitator leads the team and manages the interaction. the steps are below.
  • The Facilitator introduces the team and presents the problem to the team after explaining the purpose and procedure during the meeting
  • All the team members are advised to create their ideas silently and individually on a sheet of paper. No consultation or discussion allowed
  • The Facilitator then requests and records all the ideas from all the members in a sequential manner till all the ideas are exhausted. ( No discussion is allowed till all the ideas are exhausted). This will allow all the team members to present their ideas.
  • Building on the existing ideas is permitted during the presentation
  • The ideas are then evaluated and discussed among the team. Duplicate ideas are eliminated or merged with the team consensus. Seeking additional information from the idea generator is allowed. Facilitator ensures that focus is not concentrated on single or very few ideas.
  • Voting for the best solution is then conducted to get the group consensus using the multi voting in the following way.
  • All the members rank the final list of ideas according to their choice silently.
  • The total votes are tallied and ideas with lowest votes are eliminated. This process can be repeated till optimum solution is generated.

One of the main advantages is that the team gets equal chance to participate and also force the silent participants to be active. Second major advantage is that this method generates more ideas than a interactive session.

24 May 2014

Metrics Used in Six Sigma

The Most commonly Used metrics in Six Sigma are as below. First let us list the symbols

 

Total Number of Defects – D

Number of Units – U

Number of Defect Opportunities per Unit – O

Yield = Y

First Time Yield = FTY

Rolled Throughput Yield = RTY

Probability of Defect = P (d)

 

Total Opportunities (TOP) = clip_image002[9] 

 

Defects per Unit (DPU) = clip_image004[7]

Defects per unit opportunity (DPO) = clip_image006[7] =

                                                                      clip_image008[4]

                                                               

Defects per Million Opportunities = clip_image010[7]

 

First time Yield = clip_image012[7]

Rolled Throughput Yield = clip_image014[7]

Probability of Defect = 1- FTY

08 October 2013

Key Components of a Project Charter I – Problem Statement

image_thumb[11]

For having a Clear and Very good Project Charter, the following Components are very important. A clear understanding of the problem will help not only to build the business case to be presented, but also quickly arrive at solutions. A Problem well understood by all the stakeholders is half resolved.

The Key components of a charter are

· A Clear and un ambiguous Problem Statement.

· A Clearly defined and reachable goal to resolve or in the direction to resolve the problem

· A Business Case, stating the benefits which can be achieved by resolving the problem.

Let us first discuss the Problem Statement. It is a Known proverb that if understand the problem clearly, you are half way to the solution. A Good problem Statement shall address the following.

What?

· What is the process that is involved?

· What is wrong?

· What is the gap / opportunity?

Where/When?

· Where do we observe the problem / gap?

· What is the period for which we looking at?

· When do we observe the problem / gap?

How big?

· How big is the problem /gap/opportunity?

· What are the parameters it is impacting and by how much

· How will we measure it?

Impact? (Importance)

· What is the impact of the problem /opportunity?

· What are the benefits of the action /consequences of inaction?

Problem Statement – Example

For the period from Jan 2013 to Jun 2013 (When), the Average Fuel Consumption (What) of all the Luxury service buses is at 4.3 KMPl against a target of 6 KMPL (magnitude). This has resulted in a loss of 700000INR (Impact).

Key Considerations / Potential Pitfalls

· Is the problem based on facts or assumptions?

· Is data available or can be collected to verify and analyze the problem?

Potential Pitfalls

· Is a solution included or implied in the statement?

· Would customers be happy if they knew we were working on this?

· Does the problem statement prejudge a root cause?

· Is the problem statement too narrowly or broadly defined?

Please share this on Facebook. if you like this blog, like us on our Page

17 September 2013

What is a Project Charter in a Six Sigma Project - What are the main elements of the Charter

A Project Charter is essentially a planning doument for the six sigma project. The document also serves as an acceptance document for the project. This is the essential record through which the management accepts and supports the project. This document is essentially an agreement between the Management and the project team on what is expected from both the sides. This is used to 
  • Keep the project team aligned with the organizational Goals.
  • Clarifies what is expected out of the team
  • Keeps the team focussed on the objective
  • the project teams role is in fact increased from the champion after the charter is agreed.

A charter is prepared, once you have defined the problem, to communicate and confirm agreement between the problem-solving team and management. A simple template is presented here. http://www.docstoc.com/docs/147469086/Six-Sigma-Project-Charter-Template?

There can be many other forms to use for a project charter. The most important information needed for management to approve the project must be captured here.

Here are the essential elements of the Project Charter
  • Project Name
  • Project Goal
  • Problem Statement
  • Business Case
  • Milestones
  • Support Needed
  • Estimated Cost
  • Signatures/Approvals.
These will define the complete description of the project in the language fo Management.

11 August 2013

Key Components of a Project Charter II

image  In the previous sections I have covered the list of key components and the problem statement in the following articles. I will continue this discussion on the Charter so that the problem is well understood at all levels and support wherever needed in clearly identified. A good start is half done. Same way in a Six sigma Project, A good charter becomes heart of the project and to achieve the goals.
http://www.excellencementor.net/2013/09/what-is-project-charter-in-six-sigma.html
http://www.excellencementor.net/2013/10/key-components-of-project-charter-i.html
Once you have defined the problem clearly the other sections of the charter need to be completed.  Follow these sections in the order so that the logical flow is available. However, this is not mandatory. The details are below.
Project Goal or Goal Statement: The Goal statement is linked to resolution of the problem. Important consideration here is to set a goal which is achievable in a period of about 120 to160 days. The goal is agreed by the team and team champion as achievable. This really helps in setting the scope of the project.
Business Case & Estimated cost: This section is for the Management to understand the Return on Investment. This shall be as realistic as possible since this is commitment to the Management on the benefits of the project. The business case shall be linked to resolving the problem and the benefit shall be in line with reducing the losses as outlined in the problem statement and achieving the goal in the goal statement.
Support Needed: This will help the management to understand allocation of resources and support. This shall outline the likely support needed from outside the project team.
Milestones: Clearly define the timelines for each of the phase of the project. This will help to see if the project is in the right direction and correct course by both management and the project team.
Signatures/Approvals : This is just a commitment for the project both from management and the project team.

17 March 2013

What is Six Sigma- An Introduction to many faces of Six Sigma

Six Sigma is a Quality management program developed in Motorola in the 1980s; Adopted with a zeal by GE in mid 90s; Being used effectively all over the world now. The goal of six sigma is to achieve continual improvement. The term Six Sigma is used in many contexts with an aim of Continual Improvement. Some of them are listed below.
Six Sigma is used as a Management Philosophy focused on business process improvements to:

  • Eliminate waste, rework, and mistakes
  • Increase customer satisfaction
  • Increase profitability and competitiveness
  • Statistical measure to objectively evaluate processes.
Six Sigma is used as a business strategy by concentration on Quality and defect reduction resulting in increase profitability and competitiveness. Fewer defects will lead to increased reliability and brand popularity.
Six Sigma is used as a metric to define the Quality of the output and capability of production process to produce defect free output.  
Six Sigma Is a Method for Continual Improvement. This is the most popular use of this word. A six sigma project has a defined method of an improvement project. These are DMAIC and DFSS.
Six Sigma is a Benchmark or a Goal to achieve the highest standard of productivity. A Six Sigma Quality is equivalent to less than 3.4 defects per million opportunities. This is the Vision for most of the organizations to ensure they deliver high quality to the customers.
Six Sigma is a Statistical Measurement to define the process Capability based on Standard deviation. For any normal distribution, the process capability is equal to six Standard Deviations.
Six Sigma is used in many other contexts which are most relevant and ensure customer satisfaction.
An organization can easily tell the customer about its quality by using the term six sigma.

10 March 2013

How to Prioritize the Ideas Generated – Usage of Project Prioritization Matrix.

Previously we have discussed various ideas which can be considered for a Continual Improvement Project. Once all the ideas are identified, you need to prioritize these ideas. A total value for each project is calculated and plotted against an ease of completion number to determine which projects have the most value for the effort expended. Why Prioritization
  • Prioritization will keep your focus on the high impact improvements. it is always advisable to keep the focus while attempting the improvements. Additional benefits include greater visibility and acceptance from the stakeholders. A carefully selected project can be a game changer with respect to the perception on the Continual Improvement in any organization.
  • Prioritization helps you to rank potential projects by both their weighted benefits and their relative ease of completion.
  • It also helps in reorder the ranking of projects if the weighting of the company’s strategic goals changes (for example, the last Quarter there will be very high focus on the Revenue and targets.)
How to prioritize ideas
  • You can download the project selection matrix from the location below. http://www.docstoc.com/docs/148227866/Continual-Improvement-project-selection-criteria
  • Identify a list of project selection criteria (For example Revenue, Cost, inventory customer satisfaction, etc)
  • Develop a list of potential projects and enter in the left column of the table
  • Assign weightage to each of the criteria on top of the list. A weightage can be given based on the impact like 0- No Impact, 1- Low Impact, 3- Medium Impact and 5 – High Impact).
  • Using a team, develop a score for each of the criteria.
  • You will get the Priority Number based on Multiplication of these two.
  • You can order them according to the priority Number
  • After a project prioritization matrix is created, you can easily update it by adding new potential projects and changing the weighting of the project values to reflect changes in organizational priorities.
This work is licensed under a Creative Commons license.

27 February 2013

Ideas for Six Sigma Projects - By Function and Industry

We have discussed the General Ideas and Ideas from Issues earlier. Here is another trigger for you to look by function. If you are new in the continual Improvement Journey, these various classifications help you project identification and selection. Classifying bu function will help you to ignite those who have less time to look at general issues.
Few years back it was generally believed that the six sigma methodology is used for Manufacturing Industry is only. How ever, Many service and IT organizations have adopted this and saved tons of money. Even this methodology can be used to increase the process velocity and lean out the process. You may take up the improvements in a step by step approach which can give you better clarity and improve the whole system.

Project Selection Ideas By Function

Six Sigma Project Ideas for Finance/Accounting function
Reduce the time taken to close the accounting books (cycle time)
Improve the forecast accuracy
Spending control
Reduce balance sheet risk
Eliminate unstable customers and associated risks
Improve processing of payment to vendors/suppliers
Improve Days Sales Outstanding (DSO) — the average time taken by a company to collect payment from its customers
Reduce payroll process cycle time
Improve cash management processes
Improve payment/collection processes
Reduce electronic financial transaction costs
Reduce the cycle time of reconciliation
Reduce the procure to pay cycle
Standardize the accrual and deferral processes
Cycle time reduction in processing of Invoice generation
Reduction of cycle time in Purchase order generation

Six Sigma Project Ideas for Human Resources function
Reduce the turn around time to hire an employee
Reduce the time to process an insurance claim
Improve employee on-boarding and orientation processes
Reduce expenditures for recruiting firms
Improve hit-rate for successful hiring
Reduce Attrition
Improve timeliness and the value of employee performance reviews
Reduce absenteeism
Improve training efficiency
Improve employee satisfaction
Identify and correct retention issues

Six Sigma Project Ideas for Sales function
Improve cross-sell opportunities
Reduce time required to enter sales orders
Reduce errors and rework associated with sales orders
Reduce customer credit worthiness cycle time
Reduce the number of "bad deals" that are processed
Improve the cycle time of the entire sales order to cash process
Increase repeat orders/customers

Six Sigma Project Ideas for Shipping/Receiving function
Improve on-time delivery of products to customers
Improve on-time delivery of goods to our facility from vendors
Improve documentation accuracy
Reduce line downtime due to shipping/receiving
Improve inventory control/rotation
Improve inspection processes
Reduce the space occupied by the inventory

Now for some of the ideas by Industry. This section can be used by linking the ideas to specific industry

Sis sigma Project Ideas for Information Technology Industry
Reduce network/server/application downtime
Improve process of logging-in to network from remote locations
Improve system reliability/uptime
Standardize computer loads for configuration and support productivity improvement

Six Sigma Project Ideas for Product/Service Design industry
Reduce time required to design a product or service
Reduce errors in design
Reduce production time
Reduce testing time
Optimize Inventory

Six Sigma Project Ideas for Call Center Industry
Increase/decrease (depending on your business needs) average talk time
Reduce abandon calls
Improve employee knowledge
Reduce number of times customer is put on hold
Reduce Call drops
Improve resolution of queries
You may start resolving problems and  one at a time. do not attempt a great improvement at once. In case you have to then pilot the solution and deploy horizontally.

24 February 2013

Six Sigma Project Selection - Ideas based on issues

Previously i have mentioned some obvious areas which can be looked into where you are likely to pick some projects. Here are some more ideas which will guide you towards your continual improvement journey.
To build the culture of excellence through continual improvement, you need to start at some point and show some results. One good project completed will get push from the management to believe that continual improvement must be the strategy to grow. It can be used to scale up and also bring in more value to the stake holders. If the strategy includes involvement of people, this will spread like a wild fire across the organization. Here are some ideas based on issues currently faced by the people in the organization. As a mentor, i would suggest to start one of these to prove the results in short term and get the buy in from the stake holders.

Efficiency/Capacity Issues
Processes producing less than expected
Processes requiring overtime not requested by a customer
Processes requiring cycle times in excess of expectations
Processes with computer/machine downtime
Processes requiring expedited shipping and associated costs due to delayed output production
Any process that has added labor to make the required cycle
Too much of waiting between hand offs
Call drops or disconnects during customer calls.
Low customer Satisfaction

Understanding Process Variation
How much variation is there in your incoming materials and/or process parameters and how does this affect your output?
Where do you need the input controlled to always have a good output?
Can you scientifically adjust your process to compensate for changing material, weather, etc.?
Can your Black Belt help your supplier do a project to control the incoming product where you need it?
Does understanding your inputs allow you to produce a good part using less material?
Time taken for each call by various employees
Time taken for invoicability of the resources.

This list can go on. Essentially the power of Six Sigma is really great and can be applied across all issues to be solved. However, there is no point in making a project when you have obvious solutions visible. If you have obvious visible solutions they shall be implemented before taking up a six sigma project.

What are the areas which can be identified for Six Sigma Projects - Idea Generation

We had some guidelines on the six Sigma Projects. Now let us see what can be taken up for a Six Sigma Project.
Six Sigma is accomplished one project at a time. The billion of dollars saved by companies around the world is the cumulative effect of properly selecting and defining business issues that can be assigned to Green Belts and Black Belts for solution.  Six Sigma projects are a key action that you can take to reach your organization's strategic goals.

I have gathered some of the ideas for the Six Sigma Projects from Various Sources. Some of these are obvious and can be applied across any organization after careful evaluation. You can study them, based on your current status these can be implemented formally as projects. the prioritization shall be specific to the organization. The best approach would be pick the idea, do a brainstorming and finally come to a conclusion on the priorities. The prioritization can be done based on the current status, Quickness in results, availability of data, and so on. One of the Main criteria shall be the priorities of the Top Management who must commit the resources and provide support for the project to be a success.


General Ideas for Six Sigma Projects.
  1. Customer Satisfaction improvement.
  2. Reduce the Scrap or rejections
  3. Reduce the down time of resources (Machinery) or to increase uptime.
  4. Reduce the Rework
  5. Increase the output
  6. Increase throughput (output from multiple processes, locations, departments) or Reduce bottlenecks
  7. Reduce Quality Defects from the output
  8. Reduce customer complaints.
  9. Increase the process Velocity ( lean)
  10. Any item reworked in a process (sales contracts, invoices, surgeries, software, etc.)
  11. Reduce the Process Variation (Sales, Purchase, Recruitment  Etc)
  12. Reduce Variation of input consumption (product)
  13. Reduce the time taken for Inspection
  14. Reduce the multiple hand-offs
  15. Findings from the Internal, External, Customer and Regulatory Audits

23 February 2013

General Guidelines for Project Selection

We may have to decide on weather we need to approach the problem at hand using Six Sigma Methodologies. Here are some guide lines Which are general in nature to identify a project which can really fit into  Six Sigma.
Any project should have identifiable process inputs and outputs.
A good six sigma project should never have a pre-determined solution.  If you already know the answer, then just go fix it!
For projects that have operator or operator training as an input, focus on ways to reduce operator variation, thereby making your process more robust to different or untrained operators.
All projects need to be approached from the perspective of understanding the variation in process inputs, controlling them, and eliminating the defects. 

If you are using the Secondary data validate the data first.
You should have enough data to start with. If you do not have data or it takes too long to collect the data look for alternates. About 30-40 data points minimum in a month is ideal.

The team should be committed to the improvement project.

Sponsor should see the measurable benefits to have the support.
If geographical separation within the team is there, then find a workable solution before start of the project.

26 August 2012

What is affinity diagram, Cause and affect diagram, Fishbone diagram?

These Quality Contorl tools are used in problem Solving as a visual methods. These are used in in some lean programs also to ensure value stream and value additon.
Affinity Diagram: - Definition
A process to organize disparate language info by placing it on cards and grouping the cards that go together in a creative way. “header” cards are then used to summarize each group of cards.
Cause and Effect Diagram
A problem-solving tool used to establish relationships between effects and multiple causes.
CEDAC
Acronym for Cause and Effect Diagram with the Addition of Cards. CEDAC is a method for involving team members in the problem solving process.

Fishbone Diagram  A chart that resembles a fish skeleton, with a main spine and branches (bones) drawn at a slant off the spine; used for quality control in two main ways:
1. As a cause-and-effect diagram, where the spine denotes an effect and the branches are cause factors.
2. As a subdivision of quality requirements, where the spine represents a quality objective and the branches describe subsidiary traits or measurements that are important but are not the end in them selves. (Sometimes referred to as a Reverse Fishbone)


28 February 2012

Principles of SPC - No two things are exactly alike.

From the past experience of many generations,  we can clearly understand that things are never exactly alike. All you can find is two similar things. Even the "peas of pod" which look alike, may show some differences among them when we have a closer look. The peas are different in size, shape, colour, softness, or some thing else.
If we apply this to a product, say some products, parts or components, we know that no two manufactured parts are exactly alike each other.  In one way or the other, these parts will be slightly different in Size, Shape, or finish.
If two parts are looking alike, the differences can be found if the resolution of the measurement. The more precise you are in measuring, the differences are more clearly understood.
This is a basic problem, which will get us into trouble for making parts interchangeable, which the main aim of mass production. To work around the problem, we use tolerances.

However, our aim is to keep the variation between the parts to be minimum and as small as possible.
The above discussion is the first principle of SPC. Based on the above discussion, we can go to the second principle of Statistical Process Control (SPC) - Variation in a process or product can be measured.

26 February 2012

Roles and titles in a Six Sigma project

Black Belt 
Leaders of team responsible for measuring, analyzing, improving and controlling key processes that influence customer satisfaction and/or productivity growth. Black Belts are full-time positions.


Green Belt 
Similar to Black Belt but not a full-time position.

Master Black Belt  
First and foremost teachers. They also review and mentor Black Belts. Selection criteria for Master Black Belts are quantitative skills and the ability to teach and mentor. Master Black Belts are full-time positions.


Customer 
Any internal or external person/organization who receives the output (product or service) of the process; understanding the impact of the process on both internal and external customers is key to process management.


Process Owner
Process owners are exactly as the name sounds - they are the responsible individuals for a specific process. For instance, in the legal department there is usually one person in charge - maybe the VP of Legal - that's the process owner. There may be a Director of Marketing at your property - that's the process owner for marketing, and for the Check-in process, the process owner is typically the Front Office Manager.


Team leader
For DMAIC projects, the team leader is usually the Black Belt. For Quick Hit and iDMAIC projects, it is typically the Sponsor or Process Owner. For large DMAIC projects with more than one BB or MBB, the Team leader is the main point of contact for the project.

Team member

An active member of a Six Sigma Project team (DMAIC or iDMAIC),heavily involved in the measurement, analysis and improvement of a process. To be effective, team memberships require a minimum of 10% time commitment to a phase of the project. He/she also helps fosters the Six Sigma culture within the organization by informing /educating fellow Associates about Six Sigma tools and processes.

Transfer Team Leader (Process Owner/Department Head)

A person selected by the GM and property SIXSIGMA Council to lead an iDMAIC project based primarily on proximity and decision-making authority relative to the process involved. This person has primary responsibility for implementing the project, leading the team, and interacting with others to gather information and understanding necessary to succeed. Often, the transfer team leader will be the department head or process owner of the process being improved with the best practice. The ability to lead the team and to anticipate clear barriers are important characteristics for a person in this role.

Transfer Team Member

Associates selected by the Transfer Team Leader and Six Sigma Council to serve on the iDMAIC project based on their knowledge of key aspects of the process, experience with the current process, enthusiasm for improvement, and ability to champion change. Other key factors in selecting transfer team members include time availability and representation from relevant functions. All members will be provided training on the skills and tools used in the transfer process.

Project Sponsor

This member of the executive committee is a strong advocate of the project and can assist with barriers that may come up. He or she is accountable for the project's success and can therefore explain to Six Sigma Council members and everyone in the property the business rationale for the transfer project and assist with cross-functional collaboration efforts. He or she will remain up to date on key aspects of the project by regularly meeting with the team leader and members.
The project sponsor:
  • Is a member of the Executive committee
  • Is accountable for project success
  • Addresses cross-functional or other barriers
  • Reviews and tracks progress with team leader
  • Advocates for necessary resources

01 October 2011

Statistics -2 - Data Collection - Types of Data

The first step of any statistical enquiry is the collection of relevant numerical data. The data used for statistical purposes is mainly of two types.

Variable

a characteristic of population that can take different values (e.g., defects, processing time).

Data

Data are measurements collected on a variable

Primary Data

Data collected for the purpose of the given inquiry is called as Primary Data. These are collected by the enquirer, either by his own or through some agency set up for this purpose, directly from the field of enquiry. This type of data can be used with greater confidence because the enquirer himself decides upon the coverage of the data, definitions to be used and as such will have a greater control over the reliability of the data.

Secondary Data

The data already collected by some other agency or for some other purpose and available in published or un published form is known as secondary data. The user has to be perticularly careful about using using such data. The user must clearly understand the nature of the data, their coverage, the definitions used for the data and their reliability.
The usage of secondary data is generally preferred if the conditions mentioned above are clear and usable. This will reduce the time taken for the analysis, also reduces cost of the analysis.

Types of data

Discrete Data

Count or frequency of occurrence

Attribute Data

Data which on one of a set of discrete values such as pass or fail, yes or no.

Continuous Data

Measurements that can be meaningfully divided into finer and finer increments of precision

Usage of Sampling

The big question is weather the collection of data should be done by complete population or by sampling. If sample is used, care should be taken that this is a representative of complete population. A sample designed with care can produce results that may be sufficiently accurate for the purpose of enquiry. A Carefully designed sample can save a lot of time and money.

Methods of Data Collection

The methods used to collect data are Questionnaire Method, Interview Method and Direct Observation Method. Any one or a combination of these are used to collect data.

Usage of Data

The data collected should be subjected to a thorough scrutiny to see if they may be considered correct. The success of the analysis depends on the reliability of the data. However excellent the statistical method of data analysis may be, they cannot bring out useful and reliable information from faulty, unreliable of mistaken data. Especially, this is more applicable in case of usage of secondery data.

Like this?? - Go on the visit the next column - Statistics - 3: presntations and Organization

Statistics - 1 - What is Statistics ?

Statistics can be described as a quantitative method of scientific investigations.
If used as  plural noun 'Statistics' means the numerical data arising out of any sphere of human experience.
Used as singular 'Statistics' is the name for the body of scientific methods used for collection, analysis, Organizing, and interpretation of Numerical data.
According to American Statistical Association 'Statistics is the scientific application of mathematical principles to the collection, analysis, and presentation of numerical data'
Also, There is a different meaning for the word 'Statistic' in the field of Statistics(subject). In this sense A 'Statistic' is a numerical item which are produced by the some calculations using the data. Standard Deviation, Mean etc are called as 'Statistic'  in this sense.

This is one arm of Mathematics, which is extensively used in all most every field. Statistics has become an important tool in the work of many academic disciplines such as medicine, psychology, education, sociology, engineering and physics, just to name a few. Statistics is also important in many aspects of society such as business, industry and government. Because of the increasing use of statistics in so many areas of our lives, it has become very desirable to understand and practice statistical thinking. This is important even if you do not use statistical methods directly.

Even with so many uses, there is some mistrust in public about statistics. This is because of the misuse of the figures by the people for their convenience. It is often said by people that statistics can prove any thing. During the introduction to the course i joined on statistics, this statement is used. There are 3 types of statistics. 1 - Lies, 2- damned Lies 3- Statistics. We will teach you the 3rd part here.

Used properly statistics is a panacea for all the problems faced by the world. it can be a tremendous tool for the growth of any organization. 
Visit the next post Data Collection - Types of Data

21 March 2011

What is Six Sigma - History

Sigma is Greek for the letter 'S', and the term 'sigma' has been used for many years by statisticians, mathematicians and engineers, as a measurement unit of statistical variation till it was integrated into the quality System and business strategy by Motorola in 1987.

The seeds of this concept go back to 19790 when the Japanese management took over a TV manufacturing division of Motorola.  The Japanese concentrated on the quality of the output and actually reduced the defects to 5% of defects when the same unit was managed by Motorola. This result made the Motorola Management to take serious note of Quality.

The actual push came in Motorola only after 1981, When Bob Gavin became the CEO of Motorola. He targeted a 10 fold increase in performance within a 5 year period.

The Motorola Engineers Bill Smith or Mikal Harry - felt that measuring defects in terms of thousands was Not Sufficient for achieving a rigorous standard. They increased the measurement scale to parts per million, described as 'defects per million', which prompted the use the the 'six sigma' terminology and adoption of the capitalized 'Six Sigma' branded name, given that six sigma was deemed to equate to 3.4 parts - or defects - per million opportunities.

This has caught the eye of Gavin and launched the program Called “The Six Sigma Quality Program” on 15th Jan 1987. Stringent Targets were set to achieve Six Sigma Capability in 5 years. Astronomical Targets like 10 fold increase by 1989, and 100 fold increase by 1991 and Six sigma capability by 1992. A deep Sense of urgency was shown and every part of the organization was made to obsess with Six Sigma.

Soon after the success of Motorola, Allied Signal ( Now a part of Honeywell) plunged into this concept and achieved success.

The biggest push to Six Sigma was given by Jack Welch the CEO of General Electric (GE) in 1995. He believed the possible improvement that can be achieved by this change and imbibed into the culture of the company. There were rewards, targets and training which were incorporated. By 1998, GE Reported a savings of more than three quarters of billion in profits.

By the year 2000, Six Sigma was effectively established as an industry in its own right, involving the training, consultancy and implementation of Six Sigma methodology in all sorts of organizations around the world.

 
#InfoLinks #End of Infolinks