How to Prioritize the Ideas Generated – Usage of Project Prioritization Matrix.

Previously we have discussed various ideas which can be considered for a Continual Improvement Project. Once all the ideas are identified, you need to prioritize these ideas. A total value for each project is calculated and plotted against an ease of completion number to determine which projects have the most value for the effort expended. Why Prioritization
  • Prioritization will keep your focus on the high impact improvements. it is always advisable to keep the focus while attempting the improvements. Additional benefits include greater visibility and acceptance from the stakeholders. A carefully selected project can be a game changer with respect to the perception on the Continual Improvement in any organization.
  • Prioritization helps you to rank potential projects by both their weighted benefits and their relative ease of completion.
  • It also helps in reorder the ranking of projects if the weighting of the company’s strategic goals changes (for example, the last Quarter there will be very high focus on the Revenue and targets.)
How to prioritize ideas
  • You can download the project selection matrix from the location below. http://www.docstoc.com/docs/148227866/Continual-Improvement-project-selection-criteria
  • Identify a list of project selection criteria (For example Revenue, Cost, inventory customer satisfaction, etc)
  • Develop a list of potential projects and enter in the left column of the table
  • Assign weightage to each of the criteria on top of the list. A weightage can be given based on the impact like 0- No Impact, 1- Low Impact, 3- Medium Impact and 5 – High Impact).
  • Using a team, develop a score for each of the criteria.
  • You will get the Priority Number based on Multiplication of these two.
  • You can order them according to the priority Number
  • After a project prioritization matrix is created, you can easily update it by adding new potential projects and changing the weighting of the project values to reflect changes in organizational priorities.
This work is licensed under a Creative Commons license.

23 February 2013

General Guidelines for Project Selection

We may have to decide on weather we need to approach the problem at hand using Six Sigma Methodologies. Here are some guide lines Which are general in nature to identify a project which can really fit into  Six Sigma.
Any project should have identifiable process inputs and outputs.
A good six sigma project should never have a pre-determined solution.  If you already know the answer, then just go fix it!
For projects that have operator or operator training as an input, focus on ways to reduce operator variation, thereby making your process more robust to different or untrained operators.
All projects need to be approached from the perspective of understanding the variation in process inputs, controlling them, and eliminating the defects. 

If you are using the Secondary data validate the data first.
You should have enough data to start with. If you do not have data or it takes too long to collect the data look for alternates. About 30-40 data points minimum in a month is ideal.

The team should be committed to the improvement project.

Sponsor should see the measurable benefits to have the support.
If geographical separation within the team is there, then find a workable solution before start of the project.

 