Introduction to Configuration Management

Configuration Management and standards

Configuration Management gives the identifiability and traceability of a product at various stages of the product life. The requirements specific to configuration management are specified in various standards and Models with minor variations.

  • A Level 2 Process Area for CMMI - Configuration Management (CM)
  • Clause 7.2 of AS 9100 Rev C- Configuration Management
  • Clause 7.5.3 of ISO 9001:2008 - Identification and Traceability
  • A specific standard to deal with Configuration Management - ISO 10007

Configuration Management Process

Configuration Management process is broadly described in ISO 10007 which calls for the following steps of configuration management. These steps will help the organization to ensure the product released is of right configuration and in case of any errors, the exact point of error is traced. Also, this will help to improve the product, based on various stages.

Configuration Management Planning

A documented configuration management plan outlining the configuration management procedures being used, and describe the roles and responsibilities to manage the configuration. This plan shall be documented, controlled and approved. Wherever possible, the plan must refer to the organizational procedures.

Configuration Identification

A list of configurable items shall be selected based on various factors such as statutory and regulatory requirements, product design stages, criticality in terms of risks etc. These ites are to be selected based on their management of physical and functional characteristics being managed.

Change control

The changes to the configuration items must be controlled and documented. The process and records for changes shall include justification for change, evaluation of consequences of changes, and approval of changes. This changes shall always be base lined at periodic changes to the physical and functional characteristics of the product. 

Configuration status accounting


The configuration status accounting activities throughout the life cycle of the product in order to support and enable an efficient configuration management process. Ideally, at any point of time, the product configuration is the last baseline and the changes done after the baseline.

Configuration audit

Periodic audits are to be conducted on the configuration based on the docmented procedures, to ensure the product meets the configuration requirements are not. Genreally two types of configuration audits are conducted. 
Physical configuration Audit :  To ensure that the product is meeting the physical charecteristics as specified in the product configuration information
Functional configuration audit : To ensure that the prodcut has achieved the functional performance as defined in the product configuration information

Roles and responsibilities of Quality Assurance Manager

The Quality Assurance Manager of the organization typically Owns the Quality Management System. In smaller organizations, he reports to the top management directly.In a larger organization this position reports to the overall head of Quality (Such as Director, Vice President ...). In all cases there is a clear distinction and separated from the Operations Management. This is maintained to protect the independence of the position. This position calls for a clarity of purpose and a clear vision of the senior management. He represents the organization in the absence of a separate Management Representative during the external audits and other third party audits.
He is supported by the Quality Auditors and in some cases Quality Executives.

Typical roles and responsibilities of a Quality Assurance Manager will be either full or some of the below list.


  1. He is responsible to promote the quality culture throughout the organization.
  2. Responsible to Develop, Implement, Maintain and update a high quality plan to ensure that the organizations quality management system is in compliance with the corporate policies and quality system needs.
  3. To interact effectively with operations teams and operational process owners, to ensure that the quality system meets the requirements.
  4. Ensure that the Quality System is in compliance with national and international regulations.
  5. Formulate and manage the development and implementation of goals, objectives, policies, procedures and systems pertaining to Quality Assurance team
  6. responsible for internal audits, plan, monitor and implement.
  7. Support the organizational business objectives, through establishing and monitoring of the quality objectives
  8. Setting up and monitoring or document and record control within the organization.
  9. Laisoning with external auditors such as regulators, certification bodies and customer auditors and agree and implement the program
  10. Identify, plan and implement the quality related training across the organization
  11. Organize and manage the Quality Assurance function in line with the organizational policies
  12. Ensure identified non conformance are resolved in a timley manner for both internal and external audits
  13. Resolve customer complaints and  ensure necessary changes are made to quality system to prevent recurrence
  14. Collating and analyzing performance data and charts against defined parameters and reporting to relevant stakeholders.
  15. Plan, monitor and implement the supplier audit program and supplier approvals.
  16. Usage of statistical tools to ensure right decisions are made

Typical qualifications needed for a Quality Assurance Manager

  1. Bachelor s Degree or higher in an applied science or engineering field. 
  2. Exhibit a passion for the company s Essence, Global Imperatives, Corporate Direction.
  3. Desire to own decisions and take responsibility for outcomes. 
  4. Willingness to travel when required. 
  5. Willingness to continually embrace personal and professional development
  6. 5 years prior experience in Quality Assurance function including the below
  • Demonstrated experience working with suppliers and external parties
  • Demonstrated exceptional written and oral communication skills. 
  • Proficiency in Microsoft Office and other relevant tools. 
  • Proficiency in usage of analytic tools.
  • Experience in quality management systems. 
  • Experience in quality system audits. 
  • Demonstrates a passion and a responsibility for consumer. 

27 October 2013

Risk Management II - What are the benefits of a Risk Management Program

The previous article on Risk Management is Risk Management I - A proactive approach to resolve future root causes and their potential consequences.
Purpose of a Risk Management Plan
Risk management program defines the preparedness of an organization to deal with potential occurrences.  It defines the approch and attitude towards risks. The risk mangement program defines, what are those risks the organization is ready to accept,and the plan to deal with those un aceptable risks,and also defines the main requirements of risk management plan.
The risk Management program helps the organization in the following ways:
  • To identify risks and prapare an action plan to deal with the risk
  • To reduce occurances and impacts of risk
  • To understand significance/severity of risks
  • To promote organizational behaviors forcused on risk management
  • To increase effectiveness of product and service delivery to customer
  • Create a process for who, what, when, where, how and how much.
  • Maintain information on historic issues.
  • Capitalize on historic issues to prevent future issues.
  • Bring out hidden risk knowledge, so it can be managed.
Benifits of Risk Management Program
  • Encourage proactive management
  • Be aware of the need to identify and treat risk throughout the organization
  • Improve the identification of threats
  • Comply with relevant legal and regulatory requirements and international norms
  • Improve financial reporting and governance
  • Improve stakeholder confidence and trust
  • Establish a reliable basis for decision making and planning
  • Improve organizational controls
  • Effectively allocate and use resources for risk treatment / handling
  • Improve operational effectiveness and efficiency;
  • Cost of risk management is typically less than the cost of issue management
  • Enhance health and safety performance, as well as environmental protection
  • Minimize losses and improve loss prevention and incident management
  • Improve organizational learning and resilience
  • Increase the likelihood of achieving objectives
The most importent benifit of the risk management program is that it gives the organization a future visibility. It deals with futur events and not manage the current issues. The organization will be ready to face the realization of the risk. This gives a state of readiness against the potentila consequences

20 October 2013

Quality Auditor Job Description

A Quality Auditor is responsible for performing audits either internally or on the supplier. Generally reports to the Quality Assurance Manager. The scope of the auditor is limited to internal audits. However, the profile includes supplier audits also. The position provides exposure to internal procedures and processes. There are different levels for a auditor to work. He might be assigned with a part of business or assisting the Lead Auditor across the business. The main attribute for a auditor needed in Independence from the process being audited.

The Typical Job description of a Quality Auditor is as below.

  • Develop and coordinate audit schedules with process areas. 
  • Generate audits reports, share and coordinate results within the organization. 
  • Collect and summarize audit data for metrics and reporting.
  • Collect and summarize audit data for metrics and reporting. 
  • Revise, refine, update and recommend changes to policies, procedures, artifacts and local support materials. 
  • Issue and monitor non-conformance (CAPA/CPAR) documents. 
  • Review corrective action submittals for acceptance. 
  • Perform follow-up audits for effectiveness. 
  • Develop and revise audit checklists. 
  • Analyze and maintain trending data and submit reports, as required. 
  • Present audit summaries, lessons learned and recommend actions for continuous improvement. 
  • Represent Quality at program kick off meetings and IPP reviews. 
Skill Requirements
  • Very good analytical skill.
  • Good investigative and error-spotting skills.
  • Good in number crunching.
  • Good at creating reports using various tools and applications.
  • Should be good at communication and persuasion.
  • Learning to be objective rather than going strictly by the rule book.
  • Being able to perform risk analysis to the satisfaction of the stakeholders or departments.

15 October 2013

Job Description - Quality Black Belt, CI Process Leader, Operational Excellence Leader

The Quality Black Belt (QBB) is Often called as CI process Leader, or Operational Excellence Leader also. The main responsibility of this role is continual improvement. The will be the reporting to the Master Black Belt or a similar position within the organization. Black Belts manage the CI projects within the Company. hese projects focus on reducing internal cost, decreasing cycle time, improving organization and reducing process variation. They use six sigma skills to complete the project. They mentor the Green belt Projects.

The Main Roles and Responsibilities include
  • Identification of Continual Improvement Projects (or Support the ops team)
  • Support the management in identifying the priorities
  • Mentor the Project Team
  • Delivering training and running quality process simulations on the use of quality methodologies and tools.
  • Keeps stakeholders apprised of project status and defined deliverables. 
  • Leverages best practices and shares within the team and across the organization.
  • Develops rigorous control plans, working closely with process owners, project champions and senior management to ensure improvement gains are sustained on a long-term basis.
Qualifications
  • Bachelor’s Degree and 5+ years of experience in a business function
  • Lean and/or Six Sigma training.
  • Demonstrated project management and/or process improvement skills in a complex environment.
  • Proficiency in Microsoft Office Suite applications, including Word, Excel, PowerPoint and Outlook. 
  • Demonstrated experience leading projects. 
  • Strong facilitation skills. 
  • Effective in a variety of formal presentation settings: one-on-one, small and large groups, with peers, direct reports, managers, and senior leadership.

13 October 2013

Risk Management I - A proactive approach to resolve future root causes and their potential consequences.

Risk Management gives the visibility on the future root causes, their consequences and ways and means to reduce the impact of the potential negative effects of these future root causes.  The underlined words "Future" and "potential" here indicate, risk management is a futuristic strategy of the organization. Risk Management can be applied at all levels of the organization. It can be applied at project, level, unit level or at organization level.
Risk Management is not a mandatory process required for ISO 9001. However, this is a Mandatory process as per AS 9100 and also, a Maturity level 2 (ML2) process area for CMMI. Even though the requirements of both AS 9100 and CMMI are similar, there are subtle differences between these two.

To discuss more on the Risk Management (RSKM) we will start with few definitions.

What is Risk?
Risk is defined as an undesirable situation or circumstance that has both a likelihood of occurring and a potentially negative consequence.
This is possible at every stage of Production or Service Provision, right from the contract development stage till Post Sales. The potential negative consequence chiefly rely on the Quality, Schedule or Cost. Whatever effort you put in, the process at every stage has some possible slippages (Remember Murphy). The Organization shall therefore look at identifying and mitigating the effects of these likely slippages, at all Levels.

What is risk management?. Why is the risk management needed?
Risk Management is an iterative process to identify, assess, reduce, accept, and control risks in a systematic, proactive, comprehensive and cost effective manner, taking into account the business, costs, technical, quality and schedule programmatic constraints.
Risk Management is needed to reduce the chances of potential negative consequence of a likely event on the business. This involves a focus on the risks to meeting customer requirements, and preventing product non conformance escapes.   The absence of a Risk Management program can result in known, unknown, and unknowable /unforeseen problems for the Customer and Stakeholders concerning the cost, schedule, and technical performance of programs and concerning the quality and on-delivery performance of products and services.

In the Second Part, we will discuss the benifits of a Risk Mangement program.

12 October 2013

Career Objectives in a resume

A statement that presents a vision, guiding principles and future career aspirations for the prospective candidate. It also sets the tone of the entire resume. It tells the reader who you are in a single concise way that encompasses the very essence of your abilities.

Everyone knows the standard resume needs a career objective. But why? Is it because everyone assumes you have to have one? Is it because hiring managers require it? What would happen if you had the most comprehensive and impressive career objective that others were measured against?

The Career Objective should not be:

  • A meaningless set of dribble to fake out the reader
  • A set of words that have no tie to the candidate's wants, needs or desires for their future. 
  • A creation of disconnected terms and ideas that have no business being put together without internal assessment

Companies need to fill positions within their organization with the best qualified individual(s). Hiring managers will review hundreds of resumes with the first 30 seconds being crucial to getting to the second stage. The face to face interview.
What would the be the best career objective for your resume?
Your career objective is a one sentence character representation of who you are and sets the stage for the message you want to deliver. - "This is who I am, who I want to be and how I will make your company successful"
There are many ways to write a career objective that begins to set you apart from other candidates in the eyes of the reader...
Let's examine a sample job description for a Quality Executive:
Duties and Responsibilities:
Requirements for support specialist include:
Direct support services:
* Plan, create, and coordinate internal and external audits.
* Responsible for testing, quality assurance, configuration, installation, implementation, maintenance of all related support services.
*Identify, support, mentor continual Improvement.
Technical assistance services on the standard office applications
* Support the management with data on KPIs and Metrics
* Provide assistance to personnel in preparation of meeting presentations.
* Train the operations team on Quality activities.
These sample career objectives may come from a prospective candidates that may apply:
Analytic (1) - To obtain a position within an organization that will allow me to utilize my analytic skills, experience and willingness to help others.
Auditor (2) - To acquire a position that affords me the opportunity to bring my auditing expertise, problem solving skills and willingness to learn to make an organization successful.
Career objectives are the fundamental principles the candidate brings to the table. It enables them to promote their ideals, skills and abilities that an organization can utilize for the sole purpose of growing the company. The better a candidate can articulate the message the better the chances they will be invited to interview.
since these objectives are like a style statement on what you are, and what you want to be. It is one place holder in which you are telling the prospective employer on what you are now, what you want to be, and how the organization can derive benefit from what you want to be.

08 October 2013

Key Components of a Project Charter I – Problem Statement

image_thumb[11]

For having a Clear and Very good Project Charter, the following Components are very important. A clear understanding of the problem will help not only to build the business case to be presented, but also quickly arrive at solutions. A Problem well understood by all the stakeholders is half resolved.

The Key components of a charter are

· A Clear and un ambiguous Problem Statement.

· A Clearly defined and reachable goal to resolve or in the direction to resolve the problem

· A Business Case, stating the benefits which can be achieved by resolving the problem.

Let us first discuss the Problem Statement. It is a Known proverb that if understand the problem clearly, you are half way to the solution. A Good problem Statement shall address the following.

What?

· What is the process that is involved?

· What is wrong?

· What is the gap / opportunity?

Where/When?

· Where do we observe the problem / gap?

· What is the period for which we looking at?

· When do we observe the problem / gap?

How big?

· How big is the problem /gap/opportunity?

· What are the parameters it is impacting and by how much

· How will we measure it?

Impact? (Importance)

· What is the impact of the problem /opportunity?

· What are the benefits of the action /consequences of inaction?

Problem Statement – Example

For the period from Jan 2013 to Jun 2013 (When), the Average Fuel Consumption (What) of all the Luxury service buses is at 4.3 KMPl against a target of 6 KMPL (magnitude). This has resulted in a loss of 700000INR (Impact).

Key Considerations / Potential Pitfalls

· Is the problem based on facts or assumptions?

· Is data available or can be collected to verify and analyze the problem?

Potential Pitfalls

· Is a solution included or implied in the statement?

· Would customers be happy if they knew we were working on this?

· Does the problem statement prejudge a root cause?

· Is the problem statement too narrowly or broadly defined?

Please share this on Facebook. if you like this blog, like us on our Page

07 October 2013

Some formating rules for creating a software friendly resume

If you are applying for job at a large firm, it is most likely that your resume is going through the first filter. A software.
To make your resume getting through this software, one of the main areas to be addressed is formatting used in creating the resume. There are various software in the market. A resume is a very important tool you use in your Job Search. Here are some tips for making a software friendly resume.
  1. Do not place your contact information in the header of your resume, because filtering softwares can be set to ignore headers and footers so there is a risk this information will be deleted.
  2. Choose a conservative font such as Verdana, Arial, Tahoma, or Calibri.
  3. Serif fonts, such as Times Roman or Cambria may be rejected by screening software.Do not use any script fonts. 
  4. The smallest font size to use for the body of your resume should be 11 point. "Any smaller may not be conisdered.
  5. Strict NO to use of graphics and logos.
  6. Content in the tables may be lost.
  7. No borders to be used. this will be a trouble.
  8. Use atleast  one-inch margin top and bottom. 
  9. Do not use any lines that cross the entire page from margin to margin, because "some filters have been created that will reject a document for nothing more than having a single line run continuously across the page. It is considered as the end line.
These tips will mostly help getting through the  software for the keywords. though the filters are on the Keyword, the formatting plays a role in understanding the content.

29 September 2013

What is KPI

Key Performance Indicators (KPI’s) are the critical success factors that define an organization’s progress. KPI’s are always measurable, and are trended over time to show progress and take action where needed. KPI’s can be defined at various levels in an organization, from the CEO to the sales team to the manufacturing floor. These are the statistics generated from the organizational metrics
The KPIs are to be simple, Measurable, repeatable, and which can be analysed. They are dynamic depeding upon the organization and must be in line with the organizational goals.
KPI must be including the fundamentals, which are basic and are needed for the sustenance of the organization. In addition to this, the KPIs must be looking at future growth of the organization.

Here are some examples of KPI

At CEO level, Earnings per share, Market share etc
For a BPO, Average on-hold time for customers calling
No of defects for a engineering process
Process yield for a manufacturing team

What is Design of Experiments (DOE)

Designed of Experiments (DOE) is a structured approach for varying process and/or product factors (x’s) and quantifying their effects on process outputs (y’s), so that those outputs can be controlled to optimal levels. 

DOE deals with identification of critical factors and their reponse variables, and the magnitude of the response for each level of each of the critical factors. DoE is also used to understand the interaction between the various critical factors to ensure right mix of the critical factors to obtain the optimum amount of response.
DoE is used to understand the transfer function and mathematical model for the optimization of the response variable.
DC motor manufacturer might wish to understand the effects of two process variables, wire tension and trickle resin volume, on motor life. In this case, a simple two factor (wire tension and trickle resin volume), two level (low and high values established for each of the two factors) experiment would be a good starting point. Randomizing the order of trials in an experiment can help prevent false conclusions when other significant variables, not known to the experimenter, affect the results. There are a number of statistical tools available for planning and analyzing designed experiments.

What is a Spaghetti plot

Spaghetti plots are a method of viewing data to visualize possible flows through systems. Flows depicted in this manner appear like noodles, hence the coining of this term. This method of statistics was first used to track routing through factories. Visualizing flow in this manner can reduce inefficiency within the flow of a system. In regards to animal populations and weather buoys drifting through the ocean, they are drawn to study distribution and migration patterns. Within meteorology, these diagrams can help determine confidence in a specific weather forecast, as well as positions and intensities of high and low pressure systems. They are composed of deterministic forecasts from atmospheric models or their various ensemble members. Within medicine, they can illustrate the effects of drugs on patients during drug trials.

Single-Minute Exchange of Die (SMED)

Single-Minute Exchange of Die (SMED) is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product. This rapid changeover is key to reducing production lot sizes and thereby improving flow (Mura). The phrase "single minute" does not mean that all changeovers and startups should take only one minute, but that they should take less than 10 minutes (in other words, "single-digit minute"). Closely associated is a yet more difficult concept, One-Touch Exchange of Die, (OTED), which says changeovers can and should take less than 100 seconds. A Die is a tool used in manufacturing. However SMED's utility of is not limited to manufacturing

The concept arose in the late 1950s and early 1960s, when Shigeo Shingo was consulting to a variety of companies including Toyota, and was contemplating their inability to eliminate bottlenecks at car body-moulding presses. The bottlenecks were caused by long tool changeover times which drove up production lot sizes. The economic lot size is calculated from the ratio of actual production time and the 'change-over' time; which is the time taken to stop production of a product and start production of the same, or another, product. If change-over takes a long time then the lost production due to change-overs drives up the cost of the actual production itself. This can be seen from the table below where the change-over and processing time per unit are held constant whilst the lot size is changed. The Operation time is the unit processing time with the overhead of the change-over included. The Ratio is the percentage increase in effective operating time caused by the change-over. SMED is the key to manufacturing flexibility.

The Seven Wastes of Services

The original seven wastes (Muda (Japanese term)) were defined by Taiichi Ohno, the father of the Toyota Production System. These wastes have been often redefined to better fit new organisations, industries, or external pressures.

One redefinition of these wastes for service operations by Bicheno and Holweg (2009) is as follows:

1. Delay on the part of customers waiting for service, for delivery, in queues, for response, not arriving as promised. The customer’s time may seem free to the provider, but when she takes custom elsewhere the pain begins.
2. Duplication. Having to re-enter data, repeat details on forms, copy information across, answer queries from several sources within the same organisation.
3. Unnecessary Movement. Queuing several times, lack of one-stop, poor ergonomics in the service encounter.
4. Unclear communication, and the wastes of seeking clarification, confusion over product or service use, wasting time finding a location that may result in misuse or duplication.
5. Incorrect inventory. Being out-of-stock, unable to get exactly what was required, substitute products or services.
6. An opportunity lost to retain or win customers, a failure to establish rapport, ignoring customers, unfriendliness, and rudeness.
7. Errors in the service transaction, product defects in the product-service bundle, lost or damaged goods.

17 September 2013

What is a Project Charter in a Six Sigma Project - What are the main elements of the Charter

A Project Charter is essentially a planning doument for the six sigma project. The document also serves as an acceptance document for the project. This is the essential record through which the management accepts and supports the project. This document is essentially an agreement between the Management and the project team on what is expected from both the sides. This is used to 
  • Keep the project team aligned with the organizational Goals.
  • Clarifies what is expected out of the team
  • Keeps the team focussed on the objective
  • the project teams role is in fact increased from the champion after the charter is agreed.

A charter is prepared, once you have defined the problem, to communicate and confirm agreement between the problem-solving team and management. A simple template is presented here. http://www.docstoc.com/docs/147469086/Six-Sigma-Project-Charter-Template?

There can be many other forms to use for a project charter. The most important information needed for management to approve the project must be captured here.

Here are the essential elements of the Project Charter
  • Project Name
  • Project Goal
  • Problem Statement
  • Business Case
  • Milestones
  • Support Needed
  • Estimated Cost
  • Signatures/Approvals.
These will define the complete description of the project in the language fo Management.

26 August 2013

CMMI Service - What are the Process Areas by Maturity Levels

There are a total of 24 process areas to defined in the CMMI - Service Model. This model is also called as CMMI-SVC. These are divided into 4 groups by Maturity Level. Even though there are 5 Maturity levels, there is none defined for Level 1. The maturity levels Start only from Level 2. For an organization to achieve a specific maturity level, it must be practicing all the practices defined for each of the process area defined for the specific Level.  Level 4 & 5 are called as High Maturity Process Areas. I will discuss each of the process areas in my later posts. As the Maturity Level increases, the practices required to be implemented increases. Please note that a higher level includes all the process areas listed in the Previous level.

Now Let Us list the process areas, along with their common acronym Used.

Level 1 - Initial
None 
Level -2 - Managed

  1. Configuration Management (CM) 
  2. Measurement and Analysis (MA)
  3. Process and Product Quality Assurance (PPQA)
  4. Requirements Management (REQM)
  5. Supplier Agreement Management (SAM) - This PA is optional
  6. Service Delivery (SD)
  7. Work Monitoring and Control (WMC)
  8. Work Planning (WP)
Level -3 -Defined

  1. Capacity and Availability Management (CAM)
  2. Decision Analysis and Resolution (DAR)
  3. Incident Resolution and Prevention (IRP)
  4. Integrated Work Management (IWM)
  5. Organizational Process Definition (OPD)
  6. Organizational Process Focus (OPF
  7. Organizational Training (OT)
  8. Risk Management (RSKM)
  9. Service Continuity (SCON)
  10. Service System Development (SSD)
  11. Service System Transition (SST)
  12. Strategic Service Management (STSM)
Level - 4- Quantitatively Managed
  1. Organizational Process Performance (OPP)
  2. Quantitative Work Management (QWM)
Level - 5 Optimizing
  1. Causal Analysis and Resolution (CAR)
  2. Organizational Performance Management (OPM)
We will discuss various components subsequently

24 August 2013

Capability and Maturity Model (CMMI) - Levels of CMMI

According to Software Engineering Institute, there are 5 levels of Capability and Maturity.
They are
1. Initial - Process Ineffective, Poorly controlled and Highly Reactive.
2. Managed - Process Characterized for Projects and often Reactive
3. Defined - Process Characterized for organization and is proactive. (Projects tailor the organizational process to the project needs)
4. Quantitatively Managed - Process Measured and Controlled.
5. Optimizing - Focus on Process Improvement.
From Maturity Level 2 and above, there are a set of process Areas which the organization is expected to implement. we will discuss these in the subsequent posts.

11 August 2013

Key Components of a Project Charter II

image  In the previous sections I have covered the list of key components and the problem statement in the following articles. I will continue this discussion on the Charter so that the problem is well understood at all levels and support wherever needed in clearly identified. A good start is half done. Same way in a Six sigma Project, A good charter becomes heart of the project and to achieve the goals.
http://www.excellencementor.net/2013/09/what-is-project-charter-in-six-sigma.html
http://www.excellencementor.net/2013/10/key-components-of-project-charter-i.html
Once you have defined the problem clearly the other sections of the charter need to be completed.  Follow these sections in the order so that the logical flow is available. However, this is not mandatory. The details are below.
Project Goal or Goal Statement: The Goal statement is linked to resolution of the problem. Important consideration here is to set a goal which is achievable in a period of about 120 to160 days. The goal is agreed by the team and team champion as achievable. This really helps in setting the scope of the project.
Business Case & Estimated cost: This section is for the Management to understand the Return on Investment. This shall be as realistic as possible since this is commitment to the Management on the benefits of the project. The business case shall be linked to resolving the problem and the benefit shall be in line with reducing the losses as outlined in the problem statement and achieving the goal in the goal statement.
Support Needed: This will help the management to understand allocation of resources and support. This shall outline the likely support needed from outside the project team.
Milestones: Clearly define the timelines for each of the phase of the project. This will help to see if the project is in the right direction and correct course by both management and the project team.
Signatures/Approvals : This is just a commitment for the project both from management and the project team.

17 March 2013

What is Six Sigma- An Introduction to many faces of Six Sigma

Six Sigma is a Quality management program developed in Motorola in the 1980s; Adopted with a zeal by GE in mid 90s; Being used effectively all over the world now. The goal of six sigma is to achieve continual improvement. The term Six Sigma is used in many contexts with an aim of Continual Improvement. Some of them are listed below.
Six Sigma is used as a Management Philosophy focused on business process improvements to:

  • Eliminate waste, rework, and mistakes
  • Increase customer satisfaction
  • Increase profitability and competitiveness
  • Statistical measure to objectively evaluate processes.
Six Sigma is used as a business strategy by concentration on Quality and defect reduction resulting in increase profitability and competitiveness. Fewer defects will lead to increased reliability and brand popularity.
Six Sigma is used as a metric to define the Quality of the output and capability of production process to produce defect free output.  
Six Sigma Is a Method for Continual Improvement. This is the most popular use of this word. A six sigma project has a defined method of an improvement project. These are DMAIC and DFSS.
Six Sigma is a Benchmark or a Goal to achieve the highest standard of productivity. A Six Sigma Quality is equivalent to less than 3.4 defects per million opportunities. This is the Vision for most of the organizations to ensure they deliver high quality to the customers.
Six Sigma is a Statistical Measurement to define the process Capability based on Standard deviation. For any normal distribution, the process capability is equal to six Standard Deviations.
Six Sigma is used in many other contexts which are most relevant and ensure customer satisfaction.
An organization can easily tell the customer about its quality by using the term six sigma.

10 March 2013

How to Prioritize the Ideas Generated – Usage of Project Prioritization Matrix.

Previously we have discussed various ideas which can be considered for a Continual Improvement Project. Once all the ideas are identified, you need to prioritize these ideas. A total value for each project is calculated and plotted against an ease of completion number to determine which projects have the most value for the effort expended. Why Prioritization
  • Prioritization will keep your focus on the high impact improvements. it is always advisable to keep the focus while attempting the improvements. Additional benefits include greater visibility and acceptance from the stakeholders. A carefully selected project can be a game changer with respect to the perception on the Continual Improvement in any organization.
  • Prioritization helps you to rank potential projects by both their weighted benefits and their relative ease of completion.
  • It also helps in reorder the ranking of projects if the weighting of the company’s strategic goals changes (for example, the last Quarter there will be very high focus on the Revenue and targets.)
How to prioritize ideas
  • You can download the project selection matrix from the location below. http://www.docstoc.com/docs/148227866/Continual-Improvement-project-selection-criteria
  • Identify a list of project selection criteria (For example Revenue, Cost, inventory customer satisfaction, etc)
  • Develop a list of potential projects and enter in the left column of the table
  • Assign weightage to each of the criteria on top of the list. A weightage can be given based on the impact like 0- No Impact, 1- Low Impact, 3- Medium Impact and 5 – High Impact).
  • Using a team, develop a score for each of the criteria.
  • You will get the Priority Number based on Multiplication of these two.
  • You can order them according to the priority Number
  • After a project prioritization matrix is created, you can easily update it by adding new potential projects and changing the weighting of the project values to reflect changes in organizational priorities.
This work is licensed under a Creative Commons license.

27 February 2013

Ideas for Six Sigma Projects - By Function and Industry

We have discussed the General Ideas and Ideas from Issues earlier. Here is another trigger for you to look by function. If you are new in the continual Improvement Journey, these various classifications help you project identification and selection. Classifying bu function will help you to ignite those who have less time to look at general issues.
Few years back it was generally believed that the six sigma methodology is used for Manufacturing Industry is only. How ever, Many service and IT organizations have adopted this and saved tons of money. Even this methodology can be used to increase the process velocity and lean out the process. You may take up the improvements in a step by step approach which can give you better clarity and improve the whole system.

Project Selection Ideas By Function

Six Sigma Project Ideas for Finance/Accounting function
Reduce the time taken to close the accounting books (cycle time)
Improve the forecast accuracy
Spending control
Reduce balance sheet risk
Eliminate unstable customers and associated risks
Improve processing of payment to vendors/suppliers
Improve Days Sales Outstanding (DSO) — the average time taken by a company to collect payment from its customers
Reduce payroll process cycle time
Improve cash management processes
Improve payment/collection processes
Reduce electronic financial transaction costs
Reduce the cycle time of reconciliation
Reduce the procure to pay cycle
Standardize the accrual and deferral processes
Cycle time reduction in processing of Invoice generation
Reduction of cycle time in Purchase order generation

Six Sigma Project Ideas for Human Resources function
Reduce the turn around time to hire an employee
Reduce the time to process an insurance claim
Improve employee on-boarding and orientation processes
Reduce expenditures for recruiting firms
Improve hit-rate for successful hiring
Reduce Attrition
Improve timeliness and the value of employee performance reviews
Reduce absenteeism
Improve training efficiency
Improve employee satisfaction
Identify and correct retention issues

Six Sigma Project Ideas for Sales function
Improve cross-sell opportunities
Reduce time required to enter sales orders
Reduce errors and rework associated with sales orders
Reduce customer credit worthiness cycle time
Reduce the number of "bad deals" that are processed
Improve the cycle time of the entire sales order to cash process
Increase repeat orders/customers

Six Sigma Project Ideas for Shipping/Receiving function
Improve on-time delivery of products to customers
Improve on-time delivery of goods to our facility from vendors
Improve documentation accuracy
Reduce line downtime due to shipping/receiving
Improve inventory control/rotation
Improve inspection processes
Reduce the space occupied by the inventory

Now for some of the ideas by Industry. This section can be used by linking the ideas to specific industry

Sis sigma Project Ideas for Information Technology Industry
Reduce network/server/application downtime
Improve process of logging-in to network from remote locations
Improve system reliability/uptime
Standardize computer loads for configuration and support productivity improvement

Six Sigma Project Ideas for Product/Service Design industry
Reduce time required to design a product or service
Reduce errors in design
Reduce production time
Reduce testing time
Optimize Inventory

Six Sigma Project Ideas for Call Center Industry
Increase/decrease (depending on your business needs) average talk time
Reduce abandon calls
Improve employee knowledge
Reduce number of times customer is put on hold
Reduce Call drops
Improve resolution of queries
You may start resolving problems and  one at a time. do not attempt a great improvement at once. In case you have to then pilot the solution and deploy horizontally.

24 February 2013

Six Sigma Project Selection - Ideas based on issues

Previously i have mentioned some obvious areas which can be looked into where you are likely to pick some projects. Here are some more ideas which will guide you towards your continual improvement journey.
To build the culture of excellence through continual improvement, you need to start at some point and show some results. One good project completed will get push from the management to believe that continual improvement must be the strategy to grow. It can be used to scale up and also bring in more value to the stake holders. If the strategy includes involvement of people, this will spread like a wild fire across the organization. Here are some ideas based on issues currently faced by the people in the organization. As a mentor, i would suggest to start one of these to prove the results in short term and get the buy in from the stake holders.

Efficiency/Capacity Issues
Processes producing less than expected
Processes requiring overtime not requested by a customer
Processes requiring cycle times in excess of expectations
Processes with computer/machine downtime
Processes requiring expedited shipping and associated costs due to delayed output production
Any process that has added labor to make the required cycle
Too much of waiting between hand offs
Call drops or disconnects during customer calls.
Low customer Satisfaction

Understanding Process Variation
How much variation is there in your incoming materials and/or process parameters and how does this affect your output?
Where do you need the input controlled to always have a good output?
Can you scientifically adjust your process to compensate for changing material, weather, etc.?
Can your Black Belt help your supplier do a project to control the incoming product where you need it?
Does understanding your inputs allow you to produce a good part using less material?
Time taken for each call by various employees
Time taken for invoicability of the resources.

This list can go on. Essentially the power of Six Sigma is really great and can be applied across all issues to be solved. However, there is no point in making a project when you have obvious solutions visible. If you have obvious visible solutions they shall be implemented before taking up a six sigma project.

What are the areas which can be identified for Six Sigma Projects - Idea Generation

We had some guidelines on the six Sigma Projects. Now let us see what can be taken up for a Six Sigma Project.
Six Sigma is accomplished one project at a time. The billion of dollars saved by companies around the world is the cumulative effect of properly selecting and defining business issues that can be assigned to Green Belts and Black Belts for solution.  Six Sigma projects are a key action that you can take to reach your organization's strategic goals.

I have gathered some of the ideas for the Six Sigma Projects from Various Sources. Some of these are obvious and can be applied across any organization after careful evaluation. You can study them, based on your current status these can be implemented formally as projects. the prioritization shall be specific to the organization. The best approach would be pick the idea, do a brainstorming and finally come to a conclusion on the priorities. The prioritization can be done based on the current status, Quickness in results, availability of data, and so on. One of the Main criteria shall be the priorities of the Top Management who must commit the resources and provide support for the project to be a success.


General Ideas for Six Sigma Projects.
  1. Customer Satisfaction improvement.
  2. Reduce the Scrap or rejections
  3. Reduce the down time of resources (Machinery) or to increase uptime.
  4. Reduce the Rework
  5. Increase the output
  6. Increase throughput (output from multiple processes, locations, departments) or Reduce bottlenecks
  7. Reduce Quality Defects from the output
  8. Reduce customer complaints.
  9. Increase the process Velocity ( lean)
  10. Any item reworked in a process (sales contracts, invoices, surgeries, software, etc.)
  11. Reduce the Process Variation (Sales, Purchase, Recruitment  Etc)
  12. Reduce Variation of input consumption (product)
  13. Reduce the time taken for Inspection
  14. Reduce the multiple hand-offs
  15. Findings from the Internal, External, Customer and Regulatory Audits

23 February 2013

General Guidelines for Project Selection

We may have to decide on weather we need to approach the problem at hand using Six Sigma Methodologies. Here are some guide lines Which are general in nature to identify a project which can really fit into  Six Sigma.
Any project should have identifiable process inputs and outputs.
A good six sigma project should never have a pre-determined solution.  If you already know the answer, then just go fix it!
For projects that have operator or operator training as an input, focus on ways to reduce operator variation, thereby making your process more robust to different or untrained operators.
All projects need to be approached from the perspective of understanding the variation in process inputs, controlling them, and eliminating the defects. 

If you are using the Secondary data validate the data first.
You should have enough data to start with. If you do not have data or it takes too long to collect the data look for alternates. About 30-40 data points minimum in a month is ideal.

The team should be committed to the improvement project.

Sponsor should see the measurable benefits to have the support.
If geographical separation within the team is there, then find a workable solution before start of the project.

 