23 May 2011

What is an Audit


According to ISO 9000, the following is the definition of an audit.
Systematic, independent and documented process for obtaining audit evidence and evaluating it objectively to determine the extent to which audit criteria are fulfilled

Comparison of activity : You look at what is done and how it is done; and Compare it with the processes / procedures describing this, the way it should be done
If there are differences you have a “finding” (possibly even a non-conformity).

The Auditor should look for :
  • Fact finding’ (not ‘fault finding’)
  • The auditor should seek “compliance” (implementation) of the Process not “non-compliance” with it
  • Focus on ‘Performance’ as well as ‘Conformance’
  • Focus on audit for ‘Continuous Improvement’

01 May 2011

What are Principles of Quality Management Systems

The function of Top Management include Management of Quality Management along with other disciplines. To succeed in Business, the top management can utilize the quality management principles identified by the International Standards like ISO 900 Family. The Same principle apply for the other standards like AS 9100, TS 16949 which are supplement to ISO9001. They are
Customer Focus
The Organization depend its our customers and therefore should understand the current and future customers’ needs, should meet their requirements, and strive to exceed their expectations.
The organization must ensure that:
Customer needs & expectations are determined
Customer needs are converted into specific requirements
Customer requirements are fulfilled with the aim of “exceeding” expectations to “enhance” customer Satisfaction.
Customer Satisfaction : Customer’s perception of the degree to which the customer’s requirements have been fulfilled”(Ref: ISO 9000:2000, 3.1.4)
Customer Complaints are a common indicator of low customer satisfaction, but their absence does not necessarily imply high customer satisfaction. Even when customer requirements have been agreed with the customer and fulfilled, this does not necessarily ensure high customer satisfaction.Research shows that fewer than 5% of dissatisfied customers actually complain.
Leadership
Leaders establish a unity of purpose and the direction of the organization.  They must create and maintain the internal environment in which all employees can become fully involved in achieving the organizations objectives. There is a need for “Top Management” to play an active role in the operation & performance of the QMS.
“Top Management” involvement in the implementation & improvement of the QMS will be checked by external auditors.
Involvement of People
People at all levels are the essence of the organization and their full involvement enables their abilities to be used for the organization’s benefit. the most valuable assets of an organization is its Human Resources. The organization should create an internal environment for people at all levels feel the ownership of their task and improving it to achieve the desired customer satisfaction.
Process Approach
A desired result is achieved more efficiently when activities and related resources are managed as a process.
What is a “Process”? : “an activity using resources and managed in order to enable the transformation of inputs to outputs”. Often the output from one process directly forms the input to the next.
Systems Approach to Management
Identifying, understanding and managing interrelated processes as a system contributes to the organizations effectiveness and efficiency in achieving its objectives. Though this term looks similar to the previous one Process approach, there is distinct difference between them. to Identify clearly, “A set of processes interacting symmetrically will become a system”.
continual Improvement
Definition : Recurring activity to increase the ability to fulfill requirements (ref. ISO 9000:2000, 3.2.13)
The organization Shall strive to enhance its overall performance and this should be a permanent objective of the organization. There is a scope for everyone in the organization to Working in the business ( doing their Job) and Working on the business(improving the efficiency)
Factual Approach to Decision Making
Appropriate data should be identified, gathered and analyzed for trending and tracking in order to provide opportunities for improvement. This will lead to effective decision making.
Mutually beneficial Supplier Relations
An organization and its suppliers are interdependent and a mutually beneficial relationship enhances the ability of both to create value.
If an organization buys in poor (good) quality, it can negatively (positively) affect the organization’s performance.
The above principles identified by the ISO 9000 Family of standards as the basis for any Quality Management Systems.
If these principles are used effectively, the organization will have a sound quality management system and will lead to success.
















24 April 2011

What is the difference between Correction, Corrective Action and Preventive Action?

These three words have been widely discussed among the Quality community. For beginners, these are really confusing terms and especially not very popular with the Regulators. Very often Corrective Action and Preventive action are used with the same sense.
According to the ISO 9000 – Quality Management Systems – Fundamentals and Vocabulary the following are the definitions.
Preventive Action : (3.6.4) – Action to the eliminate cause of potential Nonconformity or other potential undesirable situation.
The word to notice here is the Potential. This means that the nonconformity has not occurred or  detected. This action is taken pre- problem.Though this is not a perfect example, this can explain the terms. A water pipe is likely to break and leak. Here the problem is not occurred but it is identified that it is likely to occur. The action may be reducing the pressure in the pipe, replacing the pipe or anything else. Even in this case the causes are found and the causes are addressed.
Preventive actions are proactive, continuous and targeted actions to reduce the instances of Corrections and corrective actions
Corrective Action (3.6.5) : Action taken to eliminate the cause of the detected Nonconformity or other undesirable situation
Correction(3.6.6) : Action taken to eliminate a detected  Nonconformity
In the cases of correction and corrective action, the noticeable word is “detected”. These actions are taken after the occurrence of the problem. Again taking the example of water pipe, the problem in this case will be the water pipe is broken or leaking” . The action to be taken in this case has be in two parts. 1) Correction : Repair the pipe or arrest the leak. This stops the leak. However this does not solve the problem. 2) The next action needed is corrective action: Find the cause which has led to the problem of leak and eliminate the cause. In this case the cause may be faulty pipe, or High pressure in the pipe, or any other or a combination of these. The problem can only be solved only if all the causes are eliminated.
There can be cases where correction not possible and only corrective action can be made. For example the pipe is broken.
The words correction, corrective action and preventive action are a little bit confusing but if used carefully, they convey very good meaning.
Preventive actions contribute to cost efficiencies, and timely delivery of the product which leads to customer satisfaction.

19 April 2011

What are the compulsory documents needed for compliance with ISO 9001:2008

To be in compliance with ISO 9001:2008, the organization must have some mandatory documents. These requirements are stated under various clauses of ISO 9001:2008.
According to ISO 9000 (QMS Fundamentals and Vocabulary), A Document is defined as "Information and its supporting medium". This is further explained in the notes to this definition.
The medium can be paper, magnetic, electronic or optical computer disk, photgraph or master sample or combination there of.
A set of documents is called as "Documentation"
The requirements of documentation for complaince with ISO 9001:2008 are as follows.
The follwoing Clauses define the documentation requirements in the Quality Management System
4.21. General
The Quality Management System Shall Include the following documentation
(4.2.1 a)  - A documented Statement of Quality Policy
( 4.2.1 a)  - A documented Statement of Quality Objectives
 (4.2.1 b)  - Quality Manual
(4.2.1 d)  - The documents including records which are to be determined by the organization as necessary for effectiveness of its QMS
(4.2.1 c) In addition to the above, the Standard identifies some documents and records which are identified under different sections of the standard
To meet the reuirement of 4.2.1 c, we need to scan through the standard for further requirements. This will be found as follws.
( 4.2.3 ) A documented procedure to define the document control
(4.2.4 )  A documented Procedure to define the controls needed for various records
(8.2.2)  A documented produre to define the responsibilities and requirements regarding internal audit.
(8.3) A documented procedure to define the control of non-conforming product
(8.5.3) A documented procedure to define the requirements concerning the Corrective Action
(8.5.4) Ad coumented procedure to define the requirements regarding Preventive Action.
To comply with these requirements, Documneted Procedure means  that the procedure is established, Documented, Implimented and Maintained.
The Documentation requirements can be covered in mpre than one document, and a single document may address one or more requirements.
All these documentation requirements may or may not be part of the Quality Manual. Where these are not part of the Quality Manual, The reference to these procedures must be provided in the Quality Manual.
Please note in addition to the requirements listed aove, the roganization may require some additional documents which may or may not be part of Quality Manual.

What is AS 9100? What is the History of Aerospace Quality Management System (QMS) Standards?

AS 9100 is the most accepted, adapted and standardized Quality Management System (QMS) Standard, addressing the requirements of Aerospace Industry.
History of AS 9100
During the decade of Nineties, Aero Space Industry does not have a standard requirement of QMS. Each major organization has a basic requirements of ISO 9000 and developed its own documentation/Specific Standards. One such Standard is D1-9000 used by Boeing to evaluate its suppliers. The other contractors have developed their own supplementary standards.This has resulted in difficulties in enforcing or compliance issues.
This has resulted in Major Aerospace Contractors coming together to establish a Single, Unified QMS Standard Acceptable to all of them. This is released as AS 9000, by the Society of Automotive Engineers (SAE) in 1999.
The relation to ISO 9000 Came in 2000, when the rewrite of ISO is being undertaken for its 2000 version. This time AS Group worked closely with ISO and the standard is based on ISO 9000 family of standards and principles. The additional requirements of safety and Regulatory requirements are added.
The current revision of AS 9100 is Rev C which has been released in Jan 2009. This revision incorporates compatibility with the latest ISO Standard ISO 9001:2008 and some additional requirements specific to defense aviation are added.
The AS Family of Standards
AS 9100 :  Quality Management Systems – Requirements for Aviation, Space and Defense Organizations.
AS 9110 : Quality Management Systems – Requirements for Aviation Maintenance Organizations
AS 9120 :  Quality Management Systems – Requirements for Aviation, Space and Defense Distributors.

09 April 2011

ISO 9001 and Certification

 
As said in an earlier article, ISO does not itself certify organizations or the certification bodies.
Organizations are certified by the Certification bodies. These Certification bodies are authorized by the accreditation bodies  of the country to audit the  organizations applying for ISO 9001 compliance certification. The various accreditation bodies have mutual agreements with each other to ensure that certificates issued by one of the Accredited Certification Bodies (CB) are accepted worldwide.
Although commonly referred to as ISO 9000:2000 certification, the actual standard to which an organization's quality management can be certified is ISO 9001:2008. The applying organization is assessed based on an extensive sample of its sites, functions, products, services and processes; a list of problems ("action requests" or "non-compliance") is made known to the management. If there are no major problems on this list, or after it receives a satisfactory improvement plan from the management showing how any problems will be resolved, the certification body will issue an ISO 9001 certificate for each geographical site it has visited.
An ISO certificate is not a once-and-for-all award, but must be renewed at regular intervals recommended by the certification body, usually around three years.
There are no grades of competence within ISO 9001: either a company is certified (meaning that it is committed to the method and model of quality management described in the standard), or it is not
Both the accreditation bodies and the certification bodies charge fees for their services. Various charges paid by the organization Certification audit fees, surveillance audit fees, re certification audit fees.
In fact, ISO itself advises that ISO 9001 can be implemented without certification, simply for the quality benefits that can be achieved.
ISO 9001 is not in any way an indication that products produced using its certified systems are any good. A company can intend to produce a poor quality product and providing it does so consistently and with the proper documentation can put an ISO 9001 stamp on it.
form the above it can be observed that the certification of ISO 9001 compliance does not guarantee the product quality. It simply means that the organization has a quality management system, which is in conformance of the ISO 9001 Standard and implemented the QMS which is good for producing a good quality product.



08 April 2011

What is the history of ISO 9001

The Previous Standards
If you track the history of ISO 9001 standards, the first initiative can be traced back to 1959, when Department of Defense published its MIL-Q-9858 Standard.
This MIL Q-9858 has been revised into NATO APQP Standards in 1969. Then the Civil Version is initiated by BSI, and published the BS 5179 guidance standards in 1974. Further this is revised into BS 5750 series of requirements Standards in 1979.
The First Version of ISO 9001 : ISO Started to work on these standards in 1981 and finally published the first version of ISO 9001:1987 retaining the same structure as BS 5750, in 1987.  This Standard has three different versions ISO 9001, ISO 9002, ISO 9003.
ISO 9001:1987 - Model for quality assurance in design, development, production, installation, and servicing was for companies and organizations whose activities included the creation of new products.
ISO 9002:1987 - Model for quality assurance in production, installation, and servicing had basically the same material as ISO 9001 but without covering the creation of new products.
ISO 9003:1987 - Model for quality assurance in final inspection and test covered only the final inspection of finished product, with no concern for how the product was produced.
The emphasis in this version tended to be placed on conformance with procedures rather than the overall process of management—which was the actual intent.
The Version ISO 9001:1994 : ISO published this version in 1994 and the major change is that it emphasizes Quality Assurance via preventive actions, instead of just checking the final product. The requirement of documented procedures is also emphasized even though this is same in the previous version.
The Version of 2000 :  ISO 9001:2004 is significantly different from the previous versions. the most important of this is the emphasis on process management. Also this version demands the involvement of top management,review of process performance, continual improvements to the quality system, monitoring of Customer satisfaction etc.
Another significant change is the integration of ISO 9001, ISO 9002 and ISO 9003 into a single standard and calling it ISO 9001.There is a provision to exclude some clauses of design and development if the company is not involved in these activities.
The Version of 2008 : Released in Feb 2008, this version only introduces clarifications to ISO 9001:2000 and some clarifications to improve compatibility with ISO 14000:2004. These changes are included in the ISO 9001:2008.

06 April 2011

The differences between Quality Assurance and Quality Control

Quality Control (QC):
►“The operational techniques and activities that are used to fulfil requirements for quality” (ref: ISO 9000)
►QC is an inspection function.
►QC requires the performance of the necessary observations, testing & documentation that verifies the work performed meets or exceeds requirements.
Quality Control makes sure the results of what you've done are what you expected.
The processes of quality control involve calibration, sampling and documenting reviews.
Quality Assurance (QA)
►“All those planned and systematic activities implemented to provide adequate confidence that an entity will fulfil requirements for quality” (ref: ISO 9000)
►QA is an audit function, used to verify that QC is being performed and performed effectively & efficiently.
Quality Assurance makes sure you are doing the right things, the right way.
Measurement is a vital aspect of Quality Assurance.
The Quality Assurance is to do with standards, processes, and policies are in place and carried out; to recommend and implement improvements to them, and to ensure that the people that need to know about them know about them. QA "audits" or "reviews" are intended to determine the efficacy of these processes, and policies.










02 April 2011

Cost of Quality

 
The term “Cost of  Quality” is generally misunderstood as the cost to create a quality product or service. The actual definition of this term is the cost incurred by not creating a quality product or service.
What can be included in cost of Quality (bad Quality)
Cost of Quality includes the cost to the organization to rectify the non conforming product or service. This includes following example
Cost incurred in reworking of a manufactured item, the men, Material and other resources.
costs incurred in skipped delivery schedules, the penalties etc.
Cost incurred in retesting of an assembly, rebuilding of a tool.
The correction of a bank statement.
The reworking of a service, such as the reprocessing of a loan operation or the replacement of a food order in a restaurant.
Warranty Claims
The biggest cost incurred by an organization on account of poor quality is the loss of customer loyalty.
In short, any cost that would not have been expended if quality were perfect contributes to the cost of quality.
The cost of Quality is only a part of Total Quality Costs which includes the following
The costs incurred by
Investing in the prevention of nonconformance to requirements.   
Appraising a product or service for conformance to requirements.
Failing to meet requirements.(Cost of Bad Quality)
The details which can be included in Total Quality Costs
Prevention Costs
The costs of all activities specifically designed to prevent poor quality in products or services.
Examples are the costs of: New product review, Quality planning , Supplier capability surveys, Process capability evaluations, Quality improvement team meetings, Quality improvement projects, Quality education and training
Appraisal Costs
The costs associated with measuring, evaluating or auditing products or services to assure conformance to quality standards and performance requirements.
These include the costs of:  Incoming and source inspection/test of purchased material, In-process and final inspection/test, Product, process or service audits, Calibration of measuring and test equipment, Associated supplies and materials
Failure Costs
The costs resulting from products or services not conforming to requirements or customer/user needs. Failure costs are divided into internal and external failure categories.
Internal Failure Costs : Failure costs occurring prior to delivery or shipment of the product, or the furnishing of a service, to the customer.
Examples are the costs of: Scrap, Rework, Re-inspection, Re-testing, Material review, Downgrading
External Failure Costs : Failure costs occurring after delivery or shipment of the product — and during or after furnishing of a service — to the customer.
Examples are the costs of:  Processing customer complaints, Customer returns, Warranty claims, Product recalls,
Total Quality Costs:
The sum of the costs listed above. This represents the difference between the actual cost of a product or service and what the reduced cost would be if there were no possibility of substandard service, failure of products or defects in their manufacture.


























28 March 2011

MUDA- An activity that is wasteful and does not add value – The Seven Wates

MUDA is a Japanese term which means that un productive or wasteful. It does not add value. An effective way to increase profitability is reduce waste. It is one of the key wastes adopted by Toyota in its Production system apart from Mura(Unevenness)  and Muri (overburden).

Toyota's Chief Engineer, Taiichi Ohno identifies the following 7 wastes while developing the Toyota Production System.

1. Over Production

Over production is To produce Manufacturing too much sooner, too early or “Just in Case” faster or in greater quantities than the absolute customer demand. This  discourages a smooth flow of goods or services, Takes the focus away from what the customer really wants, Leads to excessive inventory

What are the causes of Over Production?

Large batch sizes, Poor people utilisation, Lack of customer focus

What are the effects of over production

It Costs money, Consumes resource ahead of plan, Creates unnecessary inventory

Hides inventory/defect problems and leads to excess Space utilisation

 

2. Inventory

Excess inventory is defined as “Any raw material, work in progress (WIP) or finished goods which are not having value added to them”

what are the causes of this waste?

un even production schedule, Inaccurate forecasting, Excessive downtime/set up Large batch sizes and Unreliable suppliers

what are the effects of Inventory

It Adds to costs. It needs extra storage space. It takes extra resource to manage Can become damaged and losses due to expiry of shelf life

3. Motion

Motion in this context is the movement of “man”. Waste motion occurs when individuals move more than is necessary for the process to be completed

What are the causes of this waste?

The Main reasons are non availability of standard operating procedure, Poor housekeeping, Badly designed work area, Inadequate training

What are the effects

It adds to costs and increases the production time. It interrupts production. Can cause injury.

4. Waiting

This waste is defined as People or parts that wait for a work cycle to be completed

What are the causes?

Ineffective production planning, Shortages & unreliable supply chain, Lack of multi-skilling/flexibility, Downtime/Breakdown, Quality,design,engineering Issues. Shortage of capacity

What are the effects

Poor workflow continuity, Stop/start production, Causes bottlenecks, Long lead times, Failed delivery dates.

5.  Transportation

Unnecessary movement of parts between processes

What are the causes?

It can be caused by badly designed process/work place, Poor value stream flow,  Complex material flows, Sharing of equipment

What are the effects

It consumes resource & floorspace, Increases production time, Poor communication, Increases work in progress, Potential damage to products.

6. Over-Processing

This is defined as processing beyond the standard required by the customer

By improving processing efficiency we ultimately use less resource to achieve the same customer satisfaction

What are the causes?

Out of date standards,  Attitude , Not understanding the process, Lack of innovation & improvement, Lack of standard operation procedures

What are the effects

It consumes resource, It increases production time,  It’s work above and beyond specification, Can reduce life of component

7. Non-Right First Time (Scrap, Rework and Defects)

A defect is a component which the customer would deem unacceptable to pass the quality standard

Do it Right first time is the key

What are the causes

Out of control/Incapable processes, Lack of skill,training & on the job support,  Inaccurate design & engineering, Machine inaccuracy, 

What are the effects

It adds to costs, It interrupts the scheduled. It consumes resources .It creates paper work. Reduces customer confidence if it happens in field. Skipped deadlines.

25 March 2011

Flow Chart

What is a flow chart

A flowchart is a common chart / diagrammatic representation that represent an algorithm or process showing the sequence of  steps using various symbols and their order by connecting the operations performed within a system & sequence in which they are performed.

Shows inputs, tasks/actions and outputs of a process.

Can be used for business processes as well as production processes.

Flow charts are used in analyzing, Designing, Documenting or managing a process or program in various fields.

The first structured method for documenting process flow, the ‘Flow Process chart’ was introduced by Frank Gilberth to members of ASME in 1921 as the presentation process chart and quickly found way in to industrial Engineering curriculum

Flow chart describes what operations required to solve a problem. It is akin to blue print of a bldg. A programmer prefer to draw flow chart prior to writing a computer programming. They can help identify process that need improvement

The flow chart helps decide what steps need to be controlled & where the overall process require improving

what are the uses of a flow chart

Enhances the common understanding of a process.
Standardizes and documents reliable processes.
Helps identify measurement points.
Identifies bottlenecks.
Helps identify sources of variation in the process.
Helps generate ideas for improvement.
Aids in identifying waste and nonvalue-added steps.

Types of Flow Chart

  1. Decision flow chart
  2. Logic flow chart
  3. Process flow chart
  4. Document flow chart
  5. Data flow chart
  6. System flow chart
  7. Program flow chart 

Types of flow chart commonly used in Quality improvement projects

–MACRO

–DEPLOYMENT  – Shows control in a program within a system

Deployment flow chart

The main difference in deployment flow chart is they assign steps of a process to the individual who performs them. Begin by making column for each member of the process.

–E.G. If the process step is ‘Patient arrives at the clinic’ put this step under the ‘Patient’ column with the phrase ‘arrives’ at clinic

How to construct a process flow chart

For Creating a flow chart, it is important you map the process as accurately as possible.

1)Define the process

2)Identify steps in the process

3)Draw the flow chart

4)Determine time or distance for each step

5)Assign a cost for each step

24 March 2011

POKA YOKE – Mistake Proofing

A Japanese term “Poka Yoke”meaning Mistake proofing is very much helpful in avoiding operator mistake. This is Formalized and adopted by Shigeo Shingo as part of the  Toyota Quality Management System to achieve zero defects and eliminate the quality inspections.
This is not rocket science and can be seen in our daily life.
Some of the examples are below.

HOME


  • Automated Shut-Offs on Electric Coffee Pots
  • Ground Fault Circuit Breakers for Bathroom or Outside Electric Circuits
  • Questioning “Do you want to delete?” After Depressing the “Delete” Button on Your Computer.
  • Spell Check in Word Processing Software

 Commercial


  • Dual Palm Buttons and Other Guards on Machinery
  • Tamper-Proof Packaging
  • Bar Coding at Checkout in Retail
  • Hotels wrap paper strips around towels to reduce unnecessary replacements.

SAFETY/HOSPITAL


  • Potassium Chloride in Intra Venous Bags - premixed to avoid fatal errors
  • Surgical Trays have indentations, preventing surgeon from leaving surgical instrument in patient.
  • Pre-filled syringes in hospitals to avoid mistakes in dosage.
  • To prevent “treatment” errors, banks require tellers to record the customer’s eye color on a checklist as they start transaction.









 