24 February 2013

Six Sigma Project Selection - Ideas based on issues

Previously i have mentioned some obvious areas which can be looked into where you are likely to pick some projects. Here are some more ideas which will guide you towards your continual improvement journey.
To build the culture of excellence through continual improvement, you need to start at some point and show some results. One good project completed will get push from the management to believe that continual improvement must be the strategy to grow. It can be used to scale up and also bring in more value to the stake holders. If the strategy includes involvement of people, this will spread like a wild fire across the organization. Here are some ideas based on issues currently faced by the people in the organization. As a mentor, i would suggest to start one of these to prove the results in short term and get the buy in from the stake holders.

Efficiency/Capacity Issues
Processes producing less than expected
Processes requiring overtime not requested by a customer
Processes requiring cycle times in excess of expectations
Processes with computer/machine downtime
Processes requiring expedited shipping and associated costs due to delayed output production
Any process that has added labor to make the required cycle
Too much of waiting between hand offs
Call drops or disconnects during customer calls.
Low customer Satisfaction

Understanding Process Variation
How much variation is there in your incoming materials and/or process parameters and how does this affect your output?
Where do you need the input controlled to always have a good output?
Can you scientifically adjust your process to compensate for changing material, weather, etc.?
Can your Black Belt help your supplier do a project to control the incoming product where you need it?
Does understanding your inputs allow you to produce a good part using less material?
Time taken for each call by various employees
Time taken for invoicability of the resources.

This list can go on. Essentially the power of Six Sigma is really great and can be applied across all issues to be solved. However, there is no point in making a project when you have obvious solutions visible. If you have obvious visible solutions they shall be implemented before taking up a six sigma project.

What are the areas which can be identified for Six Sigma Projects - Idea Generation

We had some guidelines on the six Sigma Projects. Now let us see what can be taken up for a Six Sigma Project.
Six Sigma is accomplished one project at a time. The billion of dollars saved by companies around the world is the cumulative effect of properly selecting and defining business issues that can be assigned to Green Belts and Black Belts for solution.  Six Sigma projects are a key action that you can take to reach your organization's strategic goals.

I have gathered some of the ideas for the Six Sigma Projects from Various Sources. Some of these are obvious and can be applied across any organization after careful evaluation. You can study them, based on your current status these can be implemented formally as projects. the prioritization shall be specific to the organization. The best approach would be pick the idea, do a brainstorming and finally come to a conclusion on the priorities. The prioritization can be done based on the current status, Quickness in results, availability of data, and so on. One of the Main criteria shall be the priorities of the Top Management who must commit the resources and provide support for the project to be a success.


General Ideas for Six Sigma Projects.
  1. Customer Satisfaction improvement.
  2. Reduce the Scrap or rejections
  3. Reduce the down time of resources (Machinery) or to increase uptime.
  4. Reduce the Rework
  5. Increase the output
  6. Increase throughput (output from multiple processes, locations, departments) or Reduce bottlenecks
  7. Reduce Quality Defects from the output
  8. Reduce customer complaints.
  9. Increase the process Velocity ( lean)
  10. Any item reworked in a process (sales contracts, invoices, surgeries, software, etc.)
  11. Reduce the Process Variation (Sales, Purchase, Recruitment  Etc)
  12. Reduce Variation of input consumption (product)
  13. Reduce the time taken for Inspection
  14. Reduce the multiple hand-offs
  15. Findings from the Internal, External, Customer and Regulatory Audits

23 February 2013

General Guidelines for Project Selection

We may have to decide on weather we need to approach the problem at hand using Six Sigma Methodologies. Here are some guide lines Which are general in nature to identify a project which can really fit into  Six Sigma.
Any project should have identifiable process inputs and outputs.
A good six sigma project should never have a pre-determined solution.  If you already know the answer, then just go fix it!
For projects that have operator or operator training as an input, focus on ways to reduce operator variation, thereby making your process more robust to different or untrained operators.
All projects need to be approached from the perspective of understanding the variation in process inputs, controlling them, and eliminating the defects. 

If you are using the Secondary data validate the data first.
You should have enough data to start with. If you do not have data or it takes too long to collect the data look for alternates. About 30-40 data points minimum in a month is ideal.

The team should be committed to the improvement project.

Sponsor should see the measurable benefits to have the support.
If geographical separation within the team is there, then find a workable solution before start of the project.

27 September 2012

List of Different Industry Specific Standards under the ISO Standards Family

ISO 9000 family is the most widely used Quality Management System across the world. This is not specific to any Industry or Group of Industries. The requirements specified in ISO 9001 are generic in nature and can be applied to a grocery shop to a Large OEM. However, some of the Industries have felt the need for inclusion of specific Requirements based on the industry conditions. These are further included in the ISO family of standards with a distinct identification. Generally these are built upon ISO 9001 Quality Management System, with additional requirements. Whenever the ISO 9001 Standard changes, these industry specific standards are also changed.
I have put together the list of standards which are applicable for different industries. Although there is a huge list, we have added few things which are major industry adopted standards
Standard Industry Standard Prepared by
ISO 9001:2008 General ISO
ISO/TS16949:2009 Automotive International Automotive Task Force (IATF)
ISO/IEC 17025 Laboratory ISO
ISO/AS 9100 Rev C Aerospace IAQG
ISO 22000 : 2012 Food Industry ISO

ISO/TS 29001:2010

Petroleum, petrochemical and natural gas industries

ISO

In addition to these there are many other standards which are industry specific, which are not listed above. However, these are no so popular as the ones listed above.

The OEMs in these industries insist that the suppliers be certified to or atleast complaint to the industry specific standards. This will help reduce the pressure on these companies for supplier inspections rigor. This will also help the suppliers to reduce the number of audits faced. This way the cost of audit on both the supplier and the OEM are reduced.

26 August 2012

What is Value Stream Mapping?

VSM is a Lean tool, to visualize the various steps and their contribution to the overall process.
Value
When a product or service has been perceived or appraised to fulfill a need or desire--as defined by the customer--the product or service may be said to have value or worth. Components of value may include quality, utility, functionality, capacity, aesthetics, timeliness or availability, price, etc.
Value Stream

All the activities (both value-added and non-value added) required within an organization to deliver a specific service; “everything that goes into” creating and delivering the “value” to the end-customer.
Process Map
A visual representation of the sequential flow of a process. Used as a tool in problem solving, this technique makes opportunities for improvement apparent Value Stream MappingA graphical representation of all tasks and activities needed to transform input materials and information into an output.  Value Stream Analysis
The identification of all the specific activities occurring along the value stream, represented pictorially in a value stream map; see waste, unevenness, and overburden, size the opportunity, share a vision, communicate visually, permission to change, predict results
Non Value Added (NVA)

Those process steps in a Value Stream that take time, resources or space, but do not transform or shape the product or service to meet the needs of the customer 

What is Rapid Improvement Event (RIE)

Rapid Improvement Event (RIE)
A 4-5 day process utilizing a team based methodology to apply the lean tools for seeing waste and making immediate improvement and problem solving by working on the set up time or the Changeover time.
Set-up Time
Work required to change over a machine or process from one item or operation to the next item or operation; can be divided into two types:
1. Internal: set-up work that can be done only when the machine is not actively engaged in production OR
2. External: set-up work that can be done concurrently with the machine or process performing production duties
Changeover Time
As used in manufacturing, the time from when the last “good” piece comes off of a machine until the first “good” piece of the next product is made on that machine. Includes warm up, first piece inspection and adjustments. 

What is cellularization or Cellular Manufacturing?

In lean Manufacturing, Cellurization is used to great affect. These are the Quality control tools used for cycle time reduction and set up time reduction.

Cellular Manufacturing
An approach in which manufacturing work centers (cells) have the total capabilities needed to produce an item or group of similar items; contrasts to setting up work centers on the basis of similar equipment or capabilities, in which case items must move among multiple work centers before they are completed.
Cellularization
Grouping machines or processes that are connected by work sequence in a pattern that supports flow production 

What is Bottleneck and de-bottlenecking?

Bottleneck- Definition
The place in the value stream that negatively affects throughput; as a resource capacity limitation, a bottleneck will not allow a system to meet the demand of the customer.
De-bottlenecking:

Improving the throughput rate of the process bottleneck

These are some of the techniques used in lean methodolgy.

What is Autonomation

Autonomation:
Described as "intelligent automation" or "automation with a human touch.” If an abnormal situation arises the machine stops and the worker will stop the production line. Prevents the production of defective products, eliminates overproduction and focuses attention on understanding the problem and ensuring that it never recurs.

What is Policy Deployment? What are the terms used in Policy Deployment

Policy Deployment:
A one year plan, reflecting the long-term vision and the 3-5 year strategic planning objectives. A planning/implementation process that focuses on a few, major, long term, customer focused breakthrough objectives that are critical to a company’s long term success. This process links major objectives with specific support plans throughout the organization. Strategic Planning/Strategic Management methodology, developed by Dr. Yoji Akao. Also known as Hoshin Kanri.
Various Terms used in this methodology are
Annual Objectives:
In Policy Deployment, those current year objectives that will allow you to reach your 3-5 year breakthrough objectives.
Bowling Chart
A form used to track performance (plan vs actual) on Policy Deployment objectives. Usually reviewed with top management on a monthly basis.
Breakthrough Objectives:
In Policy Deployment, those objectives characterized by multi-functional teamwork, significant change in the organization, significant competitive advantage and major stretch for the organization.
Catch Ball
The process of selecting strategies to meet an objective at any level then getting managers and their teams to engage in dialogue to reach agreement on strategies to achieve their goals.
Key Performance Indicators (K.P.I.)
A method of tracking or monitoring the progress of existing daily management systems
Policy Deployment Action Plan
Form used by the team working on a PD objective, detailing specific activities required for success, milestones, responsibilities and due dates. Team members are also listed with objective definition, meeting dates and management support or owner.
Policy Deployment Matrix
Form used to show relationships between 3-5 year objectives, improvement priorities, targets, resources required and benefits to the organization

What is Andon

Andon - Definition
A device that calls attention to defects, equipment abnormalities, other problems, or reports the status and needs of a system typically by means of lights – red light for failure mode, amber light to show marginal performance, and a green light for normal operation mode.

What is affinity diagram, Cause and affect diagram, Fishbone diagram?

These Quality Contorl tools are used in problem Solving as a visual methods. These are used in in some lean programs also to ensure value stream and value additon.
Affinity Diagram: - Definition
A process to organize disparate language info by placing it on cards and grouping the cards that go together in a creative way. “header” cards are then used to summarize each group of cards.
Cause and Effect Diagram
A problem-solving tool used to establish relationships between effects and multiple causes.
CEDAC
Acronym for Cause and Effect Diagram with the Addition of Cards. CEDAC is a method for involving team members in the problem solving process.

Fishbone Diagram  A chart that resembles a fish skeleton, with a main spine and branches (bones) drawn at a slant off the spine; used for quality control in two main ways:
1. As a cause-and-effect diagram, where the spine denotes an effect and the branches are cause factors.
2. As a subdivision of quality requirements, where the spine represents a quality objective and the branches describe subsidiary traits or measurements that are important but are not the end in them selves. (Sometimes referred to as a Reverse Fishbone)


 