26 August 2012

What is Value Stream Mapping?

VSM is a Lean tool, to visualize the various steps and their contribution to the overall process.
Value
When a product or service has been perceived or appraised to fulfill a need or desire--as defined by the customer--the product or service may be said to have value or worth. Components of value may include quality, utility, functionality, capacity, aesthetics, timeliness or availability, price, etc.
Value Stream

All the activities (both value-added and non-value added) required within an organization to deliver a specific service; “everything that goes into” creating and delivering the “value” to the end-customer.
Process Map
A visual representation of the sequential flow of a process. Used as a tool in problem solving, this technique makes opportunities for improvement apparent Value Stream MappingA graphical representation of all tasks and activities needed to transform input materials and information into an output.  Value Stream Analysis
The identification of all the specific activities occurring along the value stream, represented pictorially in a value stream map; see waste, unevenness, and overburden, size the opportunity, share a vision, communicate visually, permission to change, predict results
Non Value Added (NVA)

Those process steps in a Value Stream that take time, resources or space, but do not transform or shape the product or service to meet the needs of the customer 

What is Rapid Improvement Event (RIE)

Rapid Improvement Event (RIE)
A 4-5 day process utilizing a team based methodology to apply the lean tools for seeing waste and making immediate improvement and problem solving by working on the set up time or the Changeover time.
Set-up Time
Work required to change over a machine or process from one item or operation to the next item or operation; can be divided into two types:
1. Internal: set-up work that can be done only when the machine is not actively engaged in production OR
2. External: set-up work that can be done concurrently with the machine or process performing production duties
Changeover Time
As used in manufacturing, the time from when the last “good” piece comes off of a machine until the first “good” piece of the next product is made on that machine. Includes warm up, first piece inspection and adjustments. 

What is cellularization or Cellular Manufacturing?

In lean Manufacturing, Cellurization is used to great affect. These are the Quality control tools used for cycle time reduction and set up time reduction.

Cellular Manufacturing
An approach in which manufacturing work centers (cells) have the total capabilities needed to produce an item or group of similar items; contrasts to setting up work centers on the basis of similar equipment or capabilities, in which case items must move among multiple work centers before they are completed.
Cellularization
Grouping machines or processes that are connected by work sequence in a pattern that supports flow production 

What is Bottleneck and de-bottlenecking?

Bottleneck- Definition
The place in the value stream that negatively affects throughput; as a resource capacity limitation, a bottleneck will not allow a system to meet the demand of the customer.
De-bottlenecking:

Improving the throughput rate of the process bottleneck

These are some of the techniques used in lean methodolgy.

What is Autonomation

Autonomation:
Described as "intelligent automation" or "automation with a human touch.” If an abnormal situation arises the machine stops and the worker will stop the production line. Prevents the production of defective products, eliminates overproduction and focuses attention on understanding the problem and ensuring that it never recurs.

What is Policy Deployment? What are the terms used in Policy Deployment

Policy Deployment:
A one year plan, reflecting the long-term vision and the 3-5 year strategic planning objectives. A planning/implementation process that focuses on a few, major, long term, customer focused breakthrough objectives that are critical to a company’s long term success. This process links major objectives with specific support plans throughout the organization. Strategic Planning/Strategic Management methodology, developed by Dr. Yoji Akao. Also known as Hoshin Kanri.
Various Terms used in this methodology are
Annual Objectives:
In Policy Deployment, those current year objectives that will allow you to reach your 3-5 year breakthrough objectives.
Bowling Chart
A form used to track performance (plan vs actual) on Policy Deployment objectives. Usually reviewed with top management on a monthly basis.
Breakthrough Objectives:
In Policy Deployment, those objectives characterized by multi-functional teamwork, significant change in the organization, significant competitive advantage and major stretch for the organization.
Catch Ball
The process of selecting strategies to meet an objective at any level then getting managers and their teams to engage in dialogue to reach agreement on strategies to achieve their goals.
Key Performance Indicators (K.P.I.)
A method of tracking or monitoring the progress of existing daily management systems
Policy Deployment Action Plan
Form used by the team working on a PD objective, detailing specific activities required for success, milestones, responsibilities and due dates. Team members are also listed with objective definition, meeting dates and management support or owner.
Policy Deployment Matrix
Form used to show relationships between 3-5 year objectives, improvement priorities, targets, resources required and benefits to the organization

What is Andon

Andon - Definition
A device that calls attention to defects, equipment abnormalities, other problems, or reports the status and needs of a system typically by means of lights – red light for failure mode, amber light to show marginal performance, and a green light for normal operation mode.

What is affinity diagram, Cause and affect diagram, Fishbone diagram?

These Quality Contorl tools are used in problem Solving as a visual methods. These are used in in some lean programs also to ensure value stream and value additon.
Affinity Diagram: - Definition
A process to organize disparate language info by placing it on cards and grouping the cards that go together in a creative way. “header” cards are then used to summarize each group of cards.
Cause and Effect Diagram
A problem-solving tool used to establish relationships between effects and multiple causes.
CEDAC
Acronym for Cause and Effect Diagram with the Addition of Cards. CEDAC is a method for involving team members in the problem solving process.

Fishbone Diagram  A chart that resembles a fish skeleton, with a main spine and branches (bones) drawn at a slant off the spine; used for quality control in two main ways:
1. As a cause-and-effect diagram, where the spine denotes an effect and the branches are cause factors.
2. As a subdivision of quality requirements, where the spine represents a quality objective and the branches describe subsidiary traits or measurements that are important but are not the end in them selves. (Sometimes referred to as a Reverse Fishbone)


What is A3 thinking

A3 thinking- Definition

Forces consensus building; unifies culture around a simple, systematic methodology; also becomes a communication tool that follows a logical narrative and builds over years as organization learning; A3 = metric nomenclature for a paper size equal to 11”x17” 

What is 6S -

6S - Definition
Used for improving organization of the workplace, the name comes from the six steps required to implement and the words (each starting with S) used to describe each step: sort, set in order, scrub, safety, standardize, and sustain.

19 August 2012

Thinking of waste and avoidence of waste - some early thoughts

Continuing from the previous success of Arsenal of Venice in the great tradition of manufacturing there are some early thoughts into the lean and lean manufacturing.
The Great American Author, Scientist, philosopher, Benjamin Franklin has recorded in his poor Richards Almanac, about wasted time. He also mentioned about increasing profits by reducing costs He added that avoiding unnecessary costs could be more profitable than increasing sales: "A penny saved is two pence clear. A pin a-day is a groat a-year. Save and have.". The same  thoughts continued in his book "The way to wealth". Here he attacks carrying unnecessary inventory. here is the text  "You call them goods; but, if you do not take care, they will prove evils to some of you. You expect they will be sold cheap, and, perhaps, they maybe bought  for less than they cost; but, if you have no occasion for them, they must be dear to you". Another statement form the same book "remember that many have been ruined by buying good penny Worth's."  If you look at these statements clearly, these were preaching avoidance of waste and the resulting profitability.
The concept further studied by Franklin Gilberth, who saw that some movements which are waste in the job of a mason. He Saw that the masons bend to pick the bricks and this takes considerable time. Gilberth came up with the scaffold, which reduced the movement and made the bricks available at a waist height. This has resulted in the speed of work.

These are some clear early thoughts on eliminating the waste. These became foundation for the lean journey today. In fact, Henry Ford, who was one of the fore fathers of lean thinking got his inspiration form Benjamin Franklin.

The history of lean manufacturing continues. Next we will see the effect of industrial revolution which started around 1750 on the journey of lean.

I would request readers to add the history wherever possible.

15 August 2012

Lean - How it started? Some early examples of production excellence- Arsenal of Venice

I have started this blog when i was having lot of time. of late, I am getting busy day by day. But i have decided that i will re organize my calendar and spend some time on this blog.
While talking about re organization, I looked at some value addition in what I am doing. Some of the things which I looked in this reminded me of Lean and Lean tools.
What is "Lean"?
Lean is way to determine value sought by customers, provide value through an end to end process, value stream, by engaging everyone touching the value stream to minimize waste, variations and overburden throughout the value stream.
There are some early examples in the history of production excellence using lean techniques (Mass production). One such instance which will really surprise is on the Venetian Arsenal, which is ship building facility in the city of Venice. Comparing the facts on the efficiency of this great production facility, to some of today's companies will be a great surprise and a question arises on are we really moving forward.
Enough of awe, now about the facility. (All these facts are in the range of 1100 - 1700 AD)
The Venetian Arsenal, which was the largest industrial complex located in the northern part of Italy. It has about 110 ha area, occupying almost 15% of the area of the City of Venice. This facility is responsible for producing bulk of the Naval and Merchant power of the Venetian Rulers in the Mediterranean ares.
Initially the facility worked only to maintain the privately owned ships. this changed by 1320 when the Arsenal Nuovo was built. This facility is equipped to both construct and maintain the state owned naval ships and the merchant ships.
Here are some facts of this great facility.
Number of workers - 16000
Rate of production - One ship Per Day
Number work in Progress - 100 galleys at all times.
New thinking - from the predominant hull first technique to frame first technique
consultant - Galileo Galilei

The Arsenal Nuovo used the Mass production and assembly techniques divided into 3 main processes. Framing, Planking and Cabins and Final Assembly. All these production systems are used in early 1500s and these are not seen till the industrial revolution in the late 1700s.
This seems to be the first thought of Lean and Mass production, Assembly lines, Process identification, employee specialization, continuous production etc. many thoughts were in fact used, which were the buzzwords of the Lean today.

 