26 August 2012

What is A3 thinking

A3 thinking- Definition

Forces consensus building; unifies culture around a simple, systematic methodology; also becomes a communication tool that follows a logical narrative and builds over years as organization learning; A3 = metric nomenclature for a paper size equal to 11”x17” 

What is 6S -

6S - Definition
Used for improving organization of the workplace, the name comes from the six steps required to implement and the words (each starting with S) used to describe each step: sort, set in order, scrub, safety, standardize, and sustain.

19 August 2012

Thinking of waste and avoidence of waste - some early thoughts

Continuing from the previous success of Arsenal of Venice in the great tradition of manufacturing there are some early thoughts into the lean and lean manufacturing.
The Great American Author, Scientist, philosopher, Benjamin Franklin has recorded in his poor Richards Almanac, about wasted time. He also mentioned about increasing profits by reducing costs He added that avoiding unnecessary costs could be more profitable than increasing sales: "A penny saved is two pence clear. A pin a-day is a groat a-year. Save and have.". The same  thoughts continued in his book "The way to wealth". Here he attacks carrying unnecessary inventory. here is the text  "You call them goods; but, if you do not take care, they will prove evils to some of you. You expect they will be sold cheap, and, perhaps, they maybe bought  for less than they cost; but, if you have no occasion for them, they must be dear to you". Another statement form the same book "remember that many have been ruined by buying good penny Worth's."  If you look at these statements clearly, these were preaching avoidance of waste and the resulting profitability.
The concept further studied by Franklin Gilberth, who saw that some movements which are waste in the job of a mason. He Saw that the masons bend to pick the bricks and this takes considerable time. Gilberth came up with the scaffold, which reduced the movement and made the bricks available at a waist height. This has resulted in the speed of work.

These are some clear early thoughts on eliminating the waste. These became foundation for the lean journey today. In fact, Henry Ford, who was one of the fore fathers of lean thinking got his inspiration form Benjamin Franklin.

The history of lean manufacturing continues. Next we will see the effect of industrial revolution which started around 1750 on the journey of lean.

I would request readers to add the history wherever possible.

15 August 2012

Lean - How it started? Some early examples of production excellence- Arsenal of Venice

I have started this blog when i was having lot of time. of late, I am getting busy day by day. But i have decided that i will re organize my calendar and spend some time on this blog.
While talking about re organization, I looked at some value addition in what I am doing. Some of the things which I looked in this reminded me of Lean and Lean tools.
What is "Lean"?
Lean is way to determine value sought by customers, provide value through an end to end process, value stream, by engaging everyone touching the value stream to minimize waste, variations and overburden throughout the value stream.
There are some early examples in the history of production excellence using lean techniques (Mass production). One such instance which will really surprise is on the Venetian Arsenal, which is ship building facility in the city of Venice. Comparing the facts on the efficiency of this great production facility, to some of today's companies will be a great surprise and a question arises on are we really moving forward.
Enough of awe, now about the facility. (All these facts are in the range of 1100 - 1700 AD)
The Venetian Arsenal, which was the largest industrial complex located in the northern part of Italy. It has about 110 ha area, occupying almost 15% of the area of the City of Venice. This facility is responsible for producing bulk of the Naval and Merchant power of the Venetian Rulers in the Mediterranean ares.
Initially the facility worked only to maintain the privately owned ships. this changed by 1320 when the Arsenal Nuovo was built. This facility is equipped to both construct and maintain the state owned naval ships and the merchant ships.
Here are some facts of this great facility.
Number of workers - 16000
Rate of production - One ship Per Day
Number work in Progress - 100 galleys at all times.
New thinking - from the predominant hull first technique to frame first technique
consultant - Galileo Galilei

The Arsenal Nuovo used the Mass production and assembly techniques divided into 3 main processes. Framing, Planking and Cabins and Final Assembly. All these production systems are used in early 1500s and these are not seen till the industrial revolution in the late 1700s.
This seems to be the first thought of Lean and Mass production, Assembly lines, Process identification, employee specialization, continuous production etc. many thoughts were in fact used, which were the buzzwords of the Lean today.

02 May 2012

Sixth principle of SPC - Variation due to assignable causes tend to distort the Normal Distribution Curve.

A frequency distribution is a tally of measurements that shows the number of times the measurement is included int he tally. From this frequency distribution we can see if there are only chance causes present in the process of any assignable causes are acting.
If there is a distortion from the normal curve, we can say that there is presence of assignable causes. This finding can actually help us to find the causes and address them.
Various effects of the presence of assignable causes, will tend to distort the shape in center, or the spread as sees earlier. 

Fifth Principle of SPC - It is possible to determine the shape of the distribution curve for the parts produced by any process.

We can learn abut what the process is doing, against what we want the process to do. For this we need to measure the output of the process with the design specifications.the process can be altered if we donot like the comparison, especially if we see a variation.
We need to address eh variation so that it falls in the required pattern. The variation is due to mainly of 2 types. Common Cause variation and Special Cause Variation.
If the variation in output is caused only by common causes, the output will vary in a normal and predictable manner. In such cases, the process is said to be "stable" or "in a state of Statistical Control".  While the individual measurements may differ from each other, they tend to follow a Normal Distribution.
The normal distribution is characterized by the following
  1. Location (Typical Value)
  2. Spread - Amount by which the smaller values differ from the center.
The shape of the distribution will deviate from the normal curve in case of any un usual occourances.  These changes can be called as Assignable causes.
The presence of assignable causes will result in difference from the usual normal curve, either in Shape, or in spread or a combination of both. 
Non Normal
some changes are given below. 

Normal

Non Normal


The above findings will lead us to the sixth principle of SPC - Variation due to assignable causes tend to distort the normal distribution curve.

03 March 2012

Fourth Principle of SPC - Whenever things of same kind are measured, a large group of the measurements cluster around the middle

In my last post, I have explained the Third principle of SPC. in which it was said that most measurements will be clustered around the middle. In Fact it was proved by statisticians that we can make failry accurate predictions of the percentage measurements in the various sections of the frequency distribution curve.

Frequency curve with normal distribution

You can see this graph Most measurements fall clso to the middle. This is applicable in general. You will find about 68.2% (34.1%+34.1%)of the measurements will be in the two middle sections of this graph.
28%(14%+14%) of the measurements will fall within the next two sections after the middle sections.
About 4.2%(2.1%+2.1%) will fall in the two outside sections.
A very minute percentage of the measurements will fall outside these sections.  This seems to be a bit odd, bu this is a proven fact. However, absense of external conditions is mandatory.
This Curve shown above will be called as a normal distribution. In fact many statsistical theories are centered around the theme of Normal distibution.
The above example will lead to our fifth principle of Statistical Process Control (SPC)- It is possible ot determine the shape of the distribution curve for parts/output produced by any process.

Third Principle of SPC - Things Vary according to a definite pattern

in the last post on Second Principle of SPC,  I mentioned that we notice a Feature if the measurements of the output are analysed.
If we want to see the pattern, all we need to do is plot the individual data points or the measures taken onto a tally form. we will see definite pattern begin to form after several measurements are plotted.
An easy way to demonstrate this is to roll a pair of dice about 50 times or more and record them on a tally sheet. the pattern we see is a frequency distribution.
We can make a frequency distribution curve by enclosing the tally marks in a curved line. The curve you see will have more measurements at the middle and fewer as we go away from middle. It can be seen that the curve looks like a bell.
Whenver one takes a group of measurements, a frequency distribution curve appears.

This would be explaind by the fourth basic principle of Statistical Process Control (SPC)

28 February 2012

Principles of SPC - Variation in a process or Product can be measured

We have already discussed about the same thing done by us giving different output in the first principle of SPC.
Some Variation is always inherent to our job and this is acceptable to some extent so far as the variation is within the Tolerance. However, the Variation tends to increase over a period of time. We need to measure and monitor our job to see that the variation is well within the normal expectations. If we donot make an effort to do so, we land up in trouble and the consequences add to the costs.
Even though it is always desirable to Measure the output of a process, it becomes necessary to measure the output of the process or operation to know when the trouble is brewing.
The measurements can be on the characteristics of the output. It can be the Continuous Variables dimensions, or attribute Variables like colour, shape, finish etc.
After collecting the information as described above, we must analyse to see if things are OK. When we check the output of the feature,  we will quickly notice a Feature. This feature noticed is the basis of third principle of Statistical Process control  - Things Vary according to a definite pattern 

Principles of SPC - No two things are exactly alike.

From the past experience of many generations,  we can clearly understand that things are never exactly alike. All you can find is two similar things. Even the "peas of pod" which look alike, may show some differences among them when we have a closer look. The peas are different in size, shape, colour, softness, or some thing else.
If we apply this to a product, say some products, parts or components, we know that no two manufactured parts are exactly alike each other.  In one way or the other, these parts will be slightly different in Size, Shape, or finish.
If two parts are looking alike, the differences can be found if the resolution of the measurement. The more precise you are in measuring, the differences are more clearly understood.
This is a basic problem, which will get us into trouble for making parts interchangeable, which the main aim of mass production. To work around the problem, we use tolerances.

However, our aim is to keep the variation between the parts to be minimum and as small as possible.
The above discussion is the first principle of SPC. Based on the above discussion, we can go to the second principle of Statistical Process Control (SPC) - Variation in a process or product can be measured.

27 February 2012

Six Basic Principles that are foundation for Statistical Process Control

The six principles below are the foundation for Statistical process Control. These can be clearly understood using Frequency Distributions.
The principles are listed below. The explanation is linked to each sentence
  1. No two things are exactly alike
  2. Variation in a product or process can be measured
  3. Things Vary according to a definite pattern
  4. Whenever things of the same kind are measured, a large group of the measurements will tend to cluster around the middle.
  5. It is possible to determine the shape of the distribution curve for the measured Output (Parts produced, transaction) by any process
  6. Variation is due to assignable causes tend to distort the Normal distribution Curve.
To Understand more on these principles, we can study the data from the output of the process. These foundation principles will be useful for all types of processes.

26 February 2012

Roles and titles in a Six Sigma project

Black Belt 
Leaders of team responsible for measuring, analyzing, improving and controlling key processes that influence customer satisfaction and/or productivity growth. Black Belts are full-time positions.


Green Belt 
Similar to Black Belt but not a full-time position.

Master Black Belt  
First and foremost teachers. They also review and mentor Black Belts. Selection criteria for Master Black Belts are quantitative skills and the ability to teach and mentor. Master Black Belts are full-time positions.


Customer 
Any internal or external person/organization who receives the output (product or service) of the process; understanding the impact of the process on both internal and external customers is key to process management.


Process Owner
Process owners are exactly as the name sounds - they are the responsible individuals for a specific process. For instance, in the legal department there is usually one person in charge - maybe the VP of Legal - that's the process owner. There may be a Director of Marketing at your property - that's the process owner for marketing, and for the Check-in process, the process owner is typically the Front Office Manager.


Team leader
For DMAIC projects, the team leader is usually the Black Belt. For Quick Hit and iDMAIC projects, it is typically the Sponsor or Process Owner. For large DMAIC projects with more than one BB or MBB, the Team leader is the main point of contact for the project.

Team member

An active member of a Six Sigma Project team (DMAIC or iDMAIC),heavily involved in the measurement, analysis and improvement of a process. To be effective, team memberships require a minimum of 10% time commitment to a phase of the project. He/she also helps fosters the Six Sigma culture within the organization by informing /educating fellow Associates about Six Sigma tools and processes.

Transfer Team Leader (Process Owner/Department Head)

A person selected by the GM and property SIXSIGMA Council to lead an iDMAIC project based primarily on proximity and decision-making authority relative to the process involved. This person has primary responsibility for implementing the project, leading the team, and interacting with others to gather information and understanding necessary to succeed. Often, the transfer team leader will be the department head or process owner of the process being improved with the best practice. The ability to lead the team and to anticipate clear barriers are important characteristics for a person in this role.

Transfer Team Member

Associates selected by the Transfer Team Leader and Six Sigma Council to serve on the iDMAIC project based on their knowledge of key aspects of the process, experience with the current process, enthusiasm for improvement, and ability to champion change. Other key factors in selecting transfer team members include time availability and representation from relevant functions. All members will be provided training on the skills and tools used in the transfer process.

Project Sponsor

This member of the executive committee is a strong advocate of the project and can assist with barriers that may come up. He or she is accountable for the project's success and can therefore explain to Six Sigma Council members and everyone in the property the business rationale for the transfer project and assist with cross-functional collaboration efforts. He or she will remain up to date on key aspects of the project by regularly meeting with the team leader and members.
The project sponsor:
  • Is a member of the Executive committee
  • Is accountable for project success
  • Addresses cross-functional or other barriers
  • Reviews and tracks progress with team leader
  • Advocates for necessary resources

 
#InfoLinks #End of Infolinks