05 October 2015

How to set the improvement goal for Six Sigma Project

This is a general question asked especially when Six Sigma approach is used for Improvement. In cases where the project is taken up for Problem Solving, the goal setting is straight forward. In this case the goal is to solve the problem. (or Meet the Requirements)

However, it is very tough in case of Improvement Projects. Various methods are available for setting the goal. However, there is some pre work to be done in this case.

1. Collect all the metrics which are generated from the process you want to improve, (Example - Delivery rate, Quality, Defects, Customer Satisfaction, Effort ......)
2. Prioritize and identify the Primary Metric. Primary could be anything where you can improve upon. (Start with what is important to customer)
3. Baseline the Primary Metric and its relation with the secondary metrics. (This is needed to know what will happen when your primary metric moves and optimize the goal setting.)

Now the billion dollar question " How much we should set the target" "How much we can Improve" " How much improvement we Need". 
There are no standard set of rules for setting improvement goals. However, below are few guidelines.


  1. As a minimum, the goal shall be set in such a way that the difference between the current performance and the goal is statistically significant.
  2. The goal must be in line with the business expectations and the improvement shall be a breakthrough one instead of incremental one. a 5% improvement is incremental but 50% improvement is Breakthrough
  3. The goal shall take you towards the benchmark for the same process performance. Ideally the benchmark need to be considered is the industry best practice.
  4. The goal need to cover the gap between the entitlement and the current performance by atleast 70%. Entitlement is the performance which is expected for the investments already made or the best capability of the process internally. 

26 May 2014

Getting the Ideas from the team and building a solution - Nominal Group Technique (NGT)

The nominal group technique is used to generate ideas from team in Problem identification, solution generation and decision making. It can be used for teams of any size but ideally limited between 5 to 9 members. This number is ideal to get diversity and easy to find consensus among the team. This technique is particular useful when few of the team members are more vocal than others. Generally a facilitator leads the team and manages the interaction. the steps are below.
  • The Facilitator introduces the team and presents the problem to the team after explaining the purpose and procedure during the meeting
  • All the team members are advised to create their ideas silently and individually on a sheet of paper. No consultation or discussion allowed
  • The Facilitator then requests and records all the ideas from all the members in a sequential manner till all the ideas are exhausted. ( No discussion is allowed till all the ideas are exhausted). This will allow all the team members to present their ideas.
  • Building on the existing ideas is permitted during the presentation
  • The ideas are then evaluated and discussed among the team. Duplicate ideas are eliminated or merged with the team consensus. Seeking additional information from the idea generator is allowed. Facilitator ensures that focus is not concentrated on single or very few ideas.
  • Voting for the best solution is then conducted to get the group consensus using the multi voting in the following way.
  • All the members rank the final list of ideas according to their choice silently.
  • The total votes are tallied and ideas with lowest votes are eliminated. This process can be repeated till optimum solution is generated.

One of the main advantages is that the team gets equal chance to participate and also force the silent participants to be active. Second major advantage is that this method generates more ideas than a interactive session.

24 May 2014

Metrics Used in Six Sigma

The Most commonly Used metrics in Six Sigma are as below. First let us list the symbols

 

Total Number of Defects – D

Number of Units – U

Number of Defect Opportunities per Unit – O

Yield = Y

First Time Yield = FTY

Rolled Throughput Yield = RTY

Probability of Defect = P (d)

 

Total Opportunities (TOP) = clip_image002[9] 

 

Defects per Unit (DPU) = clip_image004[7]

Defects per unit opportunity (DPO) = clip_image006[7] =

                                                                      clip_image008[4]

                                                               

Defects per Million Opportunities = clip_image010[7]

 

First time Yield = clip_image012[7]

Rolled Throughput Yield = clip_image014[7]

Probability of Defect = 1- FTY

18 April 2014

Pareto Principle - A tool to focus your efforts on the Vital Few

The Pareto Principle, named after the Italian economist Wilfred Pereto is also called famously as 80-20 rule. As far back in 1906 Pareto observed that 80% of the land in Italy is actually owned by just 20% of the people. Much later, Joseph M. Juran popularized this observation in his book titled "The Quality Control Handbook", and called this as the law of Vital Few. He observed that you could massively improve the quality by resolving the tiny fraction of the problems.
This law can be applied beyond the resolving the quality problems. In fact it can be applied across all spheres of human life. It is a powerful and fundamental principle which can be used to improve even personal productivity.
While Juran observed that 80% of the quality problems are caused by 20% of the problems.
Some of the examples of this application in various businesses are below.

  • 80% of the profits actually come from 20% of the customers 0r 20% products
  • 80% of the time spent by the customer services is on 20% of customer complaints
  • 80% of customer complaints originate from 20% of the causes.
  • 80% of your business productivity loss results from 20% of the causes
  • 20% of your staff is responsible for 80% of the business outputs and results
  • 80% of the value in the business is generated by 20% of the processes

In the personal life also this can really be applied. In-fact i have tried this myself over a long weekend and noted the time spent by few friends on a weekends. We decided to list the weekend activities which are pending for some time. We have listed the time taken for closing these actions. In fact it was only 16% of the time spent on these long pending activities.

I would stress the fact of time spent on vital few activities are only 20% or less. We need to unlearn the 50-50 rule and start scanning the environment. You tend to identify the non-essentials and focus on the essentials. 

Adoption of this rule really changes the way we think, work and do business as well. Imagine a situation where you spend 20% of time in office and produce 80% results, or focus your effort on 20% of business and scale it up by 80%.

Some of the great examples of successful application can be seen from Warren Buffet. Early in his career he decided it would be impossible for him to focus on hundreds of investments and decided the focus on Vital Few businesses he knew of. In fact at some point, Buffet owned 90% of his health from very few investments. It's not only about working smarter, what is really important is working smartly on the right things.

You can use this rule to revolutionize your business and the limit is SKY.
The only point is simple focus on the vital few. 

Please share this on Facebook. if you like this blog, like us on https://www.facebook.com/excellencementor

23 February 2014

Risk Management- II - Risk Occurrence and Response

Risk Management
The Picture above depicts typical response needed for the occurrence of Risk at various project stages and impact on the Project Goal. Before getting in to the response needed, few definitions here.

Risk - An undesirable situation or circumstance that has both a likelihood of occurring and a potentially negative consequence. This is typically a likely future event based on various project variables and not yet occurred. The impact is not being experienced yet.
Risk Mitigation - Risk Mitigation plan include the techniques followed to avoid, reduce and control the probability of occurrence of the likely future event called risk. These may include changes to the requirements, actions to reduce the occurrence such as assignment of additional responsibilities etc.
Contingency Plan - A contingency plan is essentially the planned actions in the event of failure of mitigation. All efforts are put on the reduce the probability of occurrence, but the despite best efforts, the risk may occur. The contingency plan depicts, the course of action when the risk occurs. This is essentially the plan B.
Issue Management - Issue is an event or condition that has already occurred and has negligible or little impact on the objectives. The impact is negligible as there is a work around possible and the project goal can still be achieved. The issue management will depict the actions to be taken in these condition to bring normalcy to the program.

Basic Statistics - III - Introduction to Probability

 Probability is a concept which is simple but powerful if applied correctly. A Very Simple example is that whenever there is coin tossed up,there are two outcomes possible. HEAD and Tail. If the coin has no bias, both the out comes are equally possible. We say that there is a possibility of 50% (0.5) each. Let us extend this to another commonly used game. If we throw a dice, there is a possibility of one out of the six outcomes. The dice will have 6 sides with numbers 1-6 on each side. Here the Probability is 1/6. Meaning each side has a 16.666% (0.01666) chances. In both these cases, assume that each outcome is an event, and  chance of occurrence is called probability.
There are many definitions to Probability.
The simplest is that "The measure of likelihood of occurrences".

The classical definition of probability is stated as below.
If there are "n" Exhaustive, Mutually exclusive and equally likely events, and "m" of them are favorable to an event "E" then the probability of occurrence of event "E", denoted by Pr[E] is defined as 
Pr[E] = m/n
Here N need to fulfill 3 conditions 1 - Mutually Exclusive (The events are Mutually Exclusive if there is no possibility of them occurring together. Ex : Head and Tail of a same coin.),  2- Collectively Exhaustive (All the possible events are to be taken into account. ex: in the coin it is 2 ) and 3 - Equally Likely ( there shall not be any bias towards any event.)

Statistical (Empirical) definition of Probability:
If an experiment is repeated large number of times, under identical conditions, then the limit of the ratio of number of times that an event happens(m) to the total number of trials(n), as the umber of trials increases indefinitely, is called as probability of happening of the event. 



01 January 2014

Basic Statistics-II What is a Variable and What are the types of Variables

Variable : 

A characteristic, number, or quantity that increases or decreases over time, or takes different values in different situations. The variables are the basic units used in statistics for measuring, controlling analysis and interpretation.
Variables can be classified in to different categories depending on the usage at the point of analysis.

Dependent and Independent Variables 

An independent Variable can take any value and can be controlled and measured. These are the inputs used for the study. These are also referred to as factors.
A Dependent Variable cannot be controlled. it can only be measured. these are generally output of the changes done to the independent variables. The value of the dependent variable is dependent on the relation on the independent variable. These are called as responses.
It is notable that the dependent and independent variables are not fixed. a dependent variable in one experiment or study may become factor in a different experiment or study. 
For Example, The heat generated is dependent on the amount of fuel burnt. (in this case, heat is a dependent variable and amount of fuel is an independent variable. 
In a different experiment, the time taken for completely evaporate a substance is dependent on the amount of heat supplied. in this case, the time taken is the dependent variable and amount of heat is an independent variable. It is notable here that amount of heat is dependent in one experinment and independent in another experiment.

Qualitative and Quantitative Variables.

Variables are also classified according to the type of the data they represent. This classification depends on the type of the value associated with the variable.
A Qualitative variable describes the characters in a non numerical form. They are also called as categorical variables. Examples of the values which a categorical variable can take are Good, Bad, Red, Blue, Light, heavy, etc. The variables are result, color, weight etc. This is also called as nominal variable.
A Quantitative variable has a numerical value associated with it. This would be a counted or a measured value. These are also called as Numerical variables. Examples of the values a variable are in numbers, 0, -1, 1,2 etc. the variables are height, weight etc. 
Notable that the same variable can be a qualitative or quantitative depending upon the value it takes. for example, if height is give a measured value such as 1.72 Meters, height is a quantitative variable. If the same height is expressed in a comparative value such as tall, short, height is a Qualitative Variable.

Discrete and Continuous Variables.

A discrete variable is something which is an output of counting. This can take only a set of values including negative and fractional values. Examples for a discrete variable are Number of people, charge on electron, etc.... . As a thumb rule, if there a prefix number of to the variable, it can be treated as a discrete variable. 
A continuous variable can take any value within a specified range. This is generally a measured value. examples of continuous variables are speed, height, distance etc.
Discrete and continuous variables are subset of Numerical Variables.

Binomial, Nominal and Ordinal Variables.

A binomial variable can take only two possible values. There is no third option available. For example, result of a test (pass or Fail), Result of tossing a coin (head or tail) etc
A Nominal variable can take several un-ordered values. Examples such as color red, blue, green), Type of bank account( savings, checking etc). 
An ordinal variable can have any of the several ordered values. There is clear distinction between the order of the values which are assigned example such as height (tall, short), or response in a survey of satisfaction (excellent, good, poor, etc)
Binomial, Nominal and Ordinal variables are subset of the Qualitative variables.

08 December 2013

Introduction to Configuration Management

Configuration Management and standards

Configuration Management gives the identifiability and traceability of a product at various stages of the product life. The requirements specific to configuration management are specified in various standards and Models with minor variations.

  • A Level 2 Process Area for CMMI - Configuration Management (CM)
  • Clause 7.2 of AS 9100 Rev C- Configuration Management
  • Clause 7.5.3 of ISO 9001:2008 - Identification and Traceability
  • A specific standard to deal with Configuration Management - ISO 10007

Configuration Management Process

Configuration Management process is broadly described in ISO 10007 which calls for the following steps of configuration management. These steps will help the organization to ensure the product released is of right configuration and in case of any errors, the exact point of error is traced. Also, this will help to improve the product, based on various stages.

Configuration Management Planning

A documented configuration management plan outlining the configuration management procedures being used, and describe the roles and responsibilities to manage the configuration. This plan shall be documented, controlled and approved. Wherever possible, the plan must refer to the organizational procedures.

Configuration Identification

A list of configurable items shall be selected based on various factors such as statutory and regulatory requirements, product design stages, criticality in terms of risks etc. These ites are to be selected based on their management of physical and functional characteristics being managed.

Change control

The changes to the configuration items must be controlled and documented. The process and records for changes shall include justification for change, evaluation of consequences of changes, and approval of changes. This changes shall always be base lined at periodic changes to the physical and functional characteristics of the product. 

Configuration status accounting


The configuration status accounting activities throughout the life cycle of the product in order to support and enable an efficient configuration management process. Ideally, at any point of time, the product configuration is the last baseline and the changes done after the baseline.

Configuration audit

Periodic audits are to be conducted on the configuration based on the docmented procedures, to ensure the product meets the configuration requirements are not. Genreally two types of configuration audits are conducted. 
Physical configuration Audit :  To ensure that the product is meeting the physical charecteristics as specified in the product configuration information
Functional configuration audit : To ensure that the prodcut has achieved the functional performance as defined in the product configuration information

Roles and responsibilities of Quality Assurance Manager

The Quality Assurance Manager of the organization typically Owns the Quality Management System. In smaller organizations, he reports to the top management directly.In a larger organization this position reports to the overall head of Quality (Such as Director, Vice President ...). In all cases there is a clear distinction and separated from the Operations Management. This is maintained to protect the independence of the position. This position calls for a clarity of purpose and a clear vision of the senior management. He represents the organization in the absence of a separate Management Representative during the external audits and other third party audits.
He is supported by the Quality Auditors and in some cases Quality Executives.

Typical roles and responsibilities of a Quality Assurance Manager will be either full or some of the below list.


  1. He is responsible to promote the quality culture throughout the organization.
  2. Responsible to Develop, Implement, Maintain and update a high quality plan to ensure that the organizations quality management system is in compliance with the corporate policies and quality system needs.
  3. To interact effectively with operations teams and operational process owners, to ensure that the quality system meets the requirements.
  4. Ensure that the Quality System is in compliance with national and international regulations.
  5. Formulate and manage the development and implementation of goals, objectives, policies, procedures and systems pertaining to Quality Assurance team
  6. responsible for internal audits, plan, monitor and implement.
  7. Support the organizational business objectives, through establishing and monitoring of the quality objectives
  8. Setting up and monitoring or document and record control within the organization.
  9. Laisoning with external auditors such as regulators, certification bodies and customer auditors and agree and implement the program
  10. Identify, plan and implement the quality related training across the organization
  11. Organize and manage the Quality Assurance function in line with the organizational policies
  12. Ensure identified non conformance are resolved in a timley manner for both internal and external audits
  13. Resolve customer complaints and  ensure necessary changes are made to quality system to prevent recurrence
  14. Collating and analyzing performance data and charts against defined parameters and reporting to relevant stakeholders.
  15. Plan, monitor and implement the supplier audit program and supplier approvals.
  16. Usage of statistical tools to ensure right decisions are made

Typical qualifications needed for a Quality Assurance Manager

  1. Bachelor s Degree or higher in an applied science or engineering field. 
  2. Exhibit a passion for the company s Essence, Global Imperatives, Corporate Direction.
  3. Desire to own decisions and take responsibility for outcomes. 
  4. Willingness to travel when required. 
  5. Willingness to continually embrace personal and professional development
  6. 5 years prior experience in Quality Assurance function including the below
  • Demonstrated experience working with suppliers and external parties
  • Demonstrated exceptional written and oral communication skills. 
  • Proficiency in Microsoft Office and other relevant tools. 
  • Proficiency in usage of analytic tools.
  • Experience in quality management systems. 
  • Experience in quality system audits. 
  • Demonstrates a passion and a responsibility for consumer. 

27 October 2013

Risk Management II - What are the benefits of a Risk Management Program

The previous article on Risk Management is Risk Management I - A proactive approach to resolve future root causes and their potential consequences.
Purpose of a Risk Management Plan
Risk management program defines the preparedness of an organization to deal with potential occurrences.  It defines the approch and attitude towards risks. The risk mangement program defines, what are those risks the organization is ready to accept,and the plan to deal with those un aceptable risks,and also defines the main requirements of risk management plan.
The risk Management program helps the organization in the following ways:
  • To identify risks and prapare an action plan to deal with the risk
  • To reduce occurances and impacts of risk
  • To understand significance/severity of risks
  • To promote organizational behaviors forcused on risk management
  • To increase effectiveness of product and service delivery to customer
  • Create a process for who, what, when, where, how and how much.
  • Maintain information on historic issues.
  • Capitalize on historic issues to prevent future issues.
  • Bring out hidden risk knowledge, so it can be managed.
Benifits of Risk Management Program
  • Encourage proactive management
  • Be aware of the need to identify and treat risk throughout the organization
  • Improve the identification of threats
  • Comply with relevant legal and regulatory requirements and international norms
  • Improve financial reporting and governance
  • Improve stakeholder confidence and trust
  • Establish a reliable basis for decision making and planning
  • Improve organizational controls
  • Effectively allocate and use resources for risk treatment / handling
  • Improve operational effectiveness and efficiency;
  • Cost of risk management is typically less than the cost of issue management
  • Enhance health and safety performance, as well as environmental protection
  • Minimize losses and improve loss prevention and incident management
  • Improve organizational learning and resilience
  • Increase the likelihood of achieving objectives
The most importent benifit of the risk management program is that it gives the organization a future visibility. It deals with futur events and not manage the current issues. The organization will be ready to face the realization of the risk. This gives a state of readiness against the potentila consequences

20 October 2013

Quality Auditor Job Description

A Quality Auditor is responsible for performing audits either internally or on the supplier. Generally reports to the Quality Assurance Manager. The scope of the auditor is limited to internal audits. However, the profile includes supplier audits also. The position provides exposure to internal procedures and processes. There are different levels for a auditor to work. He might be assigned with a part of business or assisting the Lead Auditor across the business. The main attribute for a auditor needed in Independence from the process being audited.

The Typical Job description of a Quality Auditor is as below.

  • Develop and coordinate audit schedules with process areas. 
  • Generate audits reports, share and coordinate results within the organization. 
  • Collect and summarize audit data for metrics and reporting.
  • Collect and summarize audit data for metrics and reporting. 
  • Revise, refine, update and recommend changes to policies, procedures, artifacts and local support materials. 
  • Issue and monitor non-conformance (CAPA/CPAR) documents. 
  • Review corrective action submittals for acceptance. 
  • Perform follow-up audits for effectiveness. 
  • Develop and revise audit checklists. 
  • Analyze and maintain trending data and submit reports, as required. 
  • Present audit summaries, lessons learned and recommend actions for continuous improvement. 
  • Represent Quality at program kick off meetings and IPP reviews. 
Skill Requirements
  • Very good analytical skill.
  • Good investigative and error-spotting skills.
  • Good in number crunching.
  • Good at creating reports using various tools and applications.
  • Should be good at communication and persuasion.
  • Learning to be objective rather than going strictly by the rule book.
  • Being able to perform risk analysis to the satisfaction of the stakeholders or departments.

15 October 2013

Job Description - Quality Black Belt, CI Process Leader, Operational Excellence Leader

The Quality Black Belt (QBB) is Often called as CI process Leader, or Operational Excellence Leader also. The main responsibility of this role is continual improvement. The will be the reporting to the Master Black Belt or a similar position within the organization. Black Belts manage the CI projects within the Company. hese projects focus on reducing internal cost, decreasing cycle time, improving organization and reducing process variation. They use six sigma skills to complete the project. They mentor the Green belt Projects.

The Main Roles and Responsibilities include
  • Identification of Continual Improvement Projects (or Support the ops team)
  • Support the management in identifying the priorities
  • Mentor the Project Team
  • Delivering training and running quality process simulations on the use of quality methodologies and tools.
  • Keeps stakeholders apprised of project status and defined deliverables. 
  • Leverages best practices and shares within the team and across the organization.
  • Develops rigorous control plans, working closely with process owners, project champions and senior management to ensure improvement gains are sustained on a long-term basis.
Qualifications
  • Bachelor’s Degree and 5+ years of experience in a business function
  • Lean and/or Six Sigma training.
  • Demonstrated project management and/or process improvement skills in a complex environment.
  • Proficiency in Microsoft Office Suite applications, including Word, Excel, PowerPoint and Outlook. 
  • Demonstrated experience leading projects. 
  • Strong facilitation skills. 
  • Effective in a variety of formal presentation settings: one-on-one, small and large groups, with peers, direct reports, managers, and senior leadership.

13 October 2013

Risk Management I - A proactive approach to resolve future root causes and their potential consequences.

Risk Management gives the visibility on the future root causes, their consequences and ways and means to reduce the impact of the potential negative effects of these future root causes.  The underlined words "Future" and "potential" here indicate, risk management is a futuristic strategy of the organization. Risk Management can be applied at all levels of the organization. It can be applied at project, level, unit level or at organization level.
Risk Management is not a mandatory process required for ISO 9001. However, this is a Mandatory process as per AS 9100 and also, a Maturity level 2 (ML2) process area for CMMI. Even though the requirements of both AS 9100 and CMMI are similar, there are subtle differences between these two.

To discuss more on the Risk Management (RSKM) we will start with few definitions.

What is Risk?
Risk is defined as an undesirable situation or circumstance that has both a likelihood of occurring and a potentially negative consequence.
This is possible at every stage of Production or Service Provision, right from the contract development stage till Post Sales. The potential negative consequence chiefly rely on the Quality, Schedule or Cost. Whatever effort you put in, the process at every stage has some possible slippages (Remember Murphy). The Organization shall therefore look at identifying and mitigating the effects of these likely slippages, at all Levels.

What is risk management?. Why is the risk management needed?
Risk Management is an iterative process to identify, assess, reduce, accept, and control risks in a systematic, proactive, comprehensive and cost effective manner, taking into account the business, costs, technical, quality and schedule programmatic constraints.
Risk Management is needed to reduce the chances of potential negative consequence of a likely event on the business. This involves a focus on the risks to meeting customer requirements, and preventing product non conformance escapes.   The absence of a Risk Management program can result in known, unknown, and unknowable /unforeseen problems for the Customer and Stakeholders concerning the cost, schedule, and technical performance of programs and concerning the quality and on-delivery performance of products and services.

In the Second Part, we will discuss the benifits of a Risk Mangement program.

12 October 2013

Career Objectives in a resume

A statement that presents a vision, guiding principles and future career aspirations for the prospective candidate. It also sets the tone of the entire resume. It tells the reader who you are in a single concise way that encompasses the very essence of your abilities.

Everyone knows the standard resume needs a career objective. But why? Is it because everyone assumes you have to have one? Is it because hiring managers require it? What would happen if you had the most comprehensive and impressive career objective that others were measured against?

The Career Objective should not be:

  • A meaningless set of dribble to fake out the reader
  • A set of words that have no tie to the candidate's wants, needs or desires for their future. 
  • A creation of disconnected terms and ideas that have no business being put together without internal assessment

Companies need to fill positions within their organization with the best qualified individual(s). Hiring managers will review hundreds of resumes with the first 30 seconds being crucial to getting to the second stage. The face to face interview.
What would the be the best career objective for your resume?
Your career objective is a one sentence character representation of who you are and sets the stage for the message you want to deliver. - "This is who I am, who I want to be and how I will make your company successful"
There are many ways to write a career objective that begins to set you apart from other candidates in the eyes of the reader...
Let's examine a sample job description for a Quality Executive:
Duties and Responsibilities:
Requirements for support specialist include:
Direct support services:
* Plan, create, and coordinate internal and external audits.
* Responsible for testing, quality assurance, configuration, installation, implementation, maintenance of all related support services.
*Identify, support, mentor continual Improvement.
Technical assistance services on the standard office applications
* Support the management with data on KPIs and Metrics
* Provide assistance to personnel in preparation of meeting presentations.
* Train the operations team on Quality activities.
These sample career objectives may come from a prospective candidates that may apply:
Analytic (1) - To obtain a position within an organization that will allow me to utilize my analytic skills, experience and willingness to help others.
Auditor (2) - To acquire a position that affords me the opportunity to bring my auditing expertise, problem solving skills and willingness to learn to make an organization successful.
Career objectives are the fundamental principles the candidate brings to the table. It enables them to promote their ideals, skills and abilities that an organization can utilize for the sole purpose of growing the company. The better a candidate can articulate the message the better the chances they will be invited to interview.
since these objectives are like a style statement on what you are, and what you want to be. It is one place holder in which you are telling the prospective employer on what you are now, what you want to be, and how the organization can derive benefit from what you want to be.

08 October 2013

Key Components of a Project Charter I – Problem Statement

image_thumb[11]

For having a Clear and Very good Project Charter, the following Components are very important. A clear understanding of the problem will help not only to build the business case to be presented, but also quickly arrive at solutions. A Problem well understood by all the stakeholders is half resolved.

The Key components of a charter are

· A Clear and un ambiguous Problem Statement.

· A Clearly defined and reachable goal to resolve or in the direction to resolve the problem

· A Business Case, stating the benefits which can be achieved by resolving the problem.

Let us first discuss the Problem Statement. It is a Known proverb that if understand the problem clearly, you are half way to the solution. A Good problem Statement shall address the following.

What?

· What is the process that is involved?

· What is wrong?

· What is the gap / opportunity?

Where/When?

· Where do we observe the problem / gap?

· What is the period for which we looking at?

· When do we observe the problem / gap?

How big?

· How big is the problem /gap/opportunity?

· What are the parameters it is impacting and by how much

· How will we measure it?

Impact? (Importance)

· What is the impact of the problem /opportunity?

· What are the benefits of the action /consequences of inaction?

Problem Statement – Example

For the period from Jan 2013 to Jun 2013 (When), the Average Fuel Consumption (What) of all the Luxury service buses is at 4.3 KMPl against a target of 6 KMPL (magnitude). This has resulted in a loss of 700000INR (Impact).

Key Considerations / Potential Pitfalls

· Is the problem based on facts or assumptions?

· Is data available or can be collected to verify and analyze the problem?

Potential Pitfalls

· Is a solution included or implied in the statement?

· Would customers be happy if they knew we were working on this?

· Does the problem statement prejudge a root cause?

· Is the problem statement too narrowly or broadly defined?

Please share this on Facebook. if you like this blog, like us on our Page

07 October 2013

Some formating rules for creating a software friendly resume

If you are applying for job at a large firm, it is most likely that your resume is going through the first filter. A software.
To make your resume getting through this software, one of the main areas to be addressed is formatting used in creating the resume. There are various software in the market. A resume is a very important tool you use in your Job Search. Here are some tips for making a software friendly resume.
  1. Do not place your contact information in the header of your resume, because filtering softwares can be set to ignore headers and footers so there is a risk this information will be deleted.
  2. Choose a conservative font such as Verdana, Arial, Tahoma, or Calibri.
  3. Serif fonts, such as Times Roman or Cambria may be rejected by screening software.Do not use any script fonts. 
  4. The smallest font size to use for the body of your resume should be 11 point. "Any smaller may not be conisdered.
  5. Strict NO to use of graphics and logos.
  6. Content in the tables may be lost.
  7. No borders to be used. this will be a trouble.
  8. Use atleast  one-inch margin top and bottom. 
  9. Do not use any lines that cross the entire page from margin to margin, because "some filters have been created that will reject a document for nothing more than having a single line run continuously across the page. It is considered as the end line.
These tips will mostly help getting through the  software for the keywords. though the filters are on the Keyword, the formatting plays a role in understanding the content.

29 September 2013

What is KPI

Key Performance Indicators (KPI’s) are the critical success factors that define an organization’s progress. KPI’s are always measurable, and are trended over time to show progress and take action where needed. KPI’s can be defined at various levels in an organization, from the CEO to the sales team to the manufacturing floor. These are the statistics generated from the organizational metrics
The KPIs are to be simple, Measurable, repeatable, and which can be analysed. They are dynamic depeding upon the organization and must be in line with the organizational goals.
KPI must be including the fundamentals, which are basic and are needed for the sustenance of the organization. In addition to this, the KPIs must be looking at future growth of the organization.

Here are some examples of KPI

At CEO level, Earnings per share, Market share etc
For a BPO, Average on-hold time for customers calling
No of defects for a engineering process
Process yield for a manufacturing team

What is Design of Experiments (DOE)

Designed of Experiments (DOE) is a structured approach for varying process and/or product factors (x’s) and quantifying their effects on process outputs (y’s), so that those outputs can be controlled to optimal levels. 

DOE deals with identification of critical factors and their reponse variables, and the magnitude of the response for each level of each of the critical factors. DoE is also used to understand the interaction between the various critical factors to ensure right mix of the critical factors to obtain the optimum amount of response.
DoE is used to understand the transfer function and mathematical model for the optimization of the response variable.
DC motor manufacturer might wish to understand the effects of two process variables, wire tension and trickle resin volume, on motor life. In this case, a simple two factor (wire tension and trickle resin volume), two level (low and high values established for each of the two factors) experiment would be a good starting point. Randomizing the order of trials in an experiment can help prevent false conclusions when other significant variables, not known to the experimenter, affect the results. There are a number of statistical tools available for planning and analyzing designed experiments.

What is a Spaghetti plot

Spaghetti plots are a method of viewing data to visualize possible flows through systems. Flows depicted in this manner appear like noodles, hence the coining of this term. This method of statistics was first used to track routing through factories. Visualizing flow in this manner can reduce inefficiency within the flow of a system. In regards to animal populations and weather buoys drifting through the ocean, they are drawn to study distribution and migration patterns. Within meteorology, these diagrams can help determine confidence in a specific weather forecast, as well as positions and intensities of high and low pressure systems. They are composed of deterministic forecasts from atmospheric models or their various ensemble members. Within medicine, they can illustrate the effects of drugs on patients during drug trials.

Single-Minute Exchange of Die (SMED)

Single-Minute Exchange of Die (SMED) is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product. This rapid changeover is key to reducing production lot sizes and thereby improving flow (Mura). The phrase "single minute" does not mean that all changeovers and startups should take only one minute, but that they should take less than 10 minutes (in other words, "single-digit minute"). Closely associated is a yet more difficult concept, One-Touch Exchange of Die, (OTED), which says changeovers can and should take less than 100 seconds. A Die is a tool used in manufacturing. However SMED's utility of is not limited to manufacturing

The concept arose in the late 1950s and early 1960s, when Shigeo Shingo was consulting to a variety of companies including Toyota, and was contemplating their inability to eliminate bottlenecks at car body-moulding presses. The bottlenecks were caused by long tool changeover times which drove up production lot sizes. The economic lot size is calculated from the ratio of actual production time and the 'change-over' time; which is the time taken to stop production of a product and start production of the same, or another, product. If change-over takes a long time then the lost production due to change-overs drives up the cost of the actual production itself. This can be seen from the table below where the change-over and processing time per unit are held constant whilst the lot size is changed. The Operation time is the unit processing time with the overhead of the change-over included. The Ratio is the percentage increase in effective operating time caused by the change-over. SMED is the key to manufacturing flexibility.

 
#InfoLinks #End of Infolinks